Microsoft data center, Guaynabo

Microsoft data center, Guaynabo is a data center in Guaynabo, Guaynabo, Puerto Rico. Its power comes off the Puerto Rico grid, which runs on 44% natural gas, 39% oil and 15% coal.

OperatorMicrosoftas mapped
Grid CO₂1,543 lbper MWh, PRMS region

Location

This data centerOther data centersPower plants (colored by fuel)

Address48 Avenida El Caño, Guaynabo PR 00968
CountyGuaynabo, Puerto Rico
Coordinates18.41744, -66.10899
On OpenStreetMapnode/10014176940

What powers Microsoft data center, Guaynabo

A data center doesn't run on the nearest power plant. It draws from the regional grid, where electricity from every plant on the system mixes. This site is in EPA's Puerto Rico grid region. In 2023, the region's electricity was 44% natural gas, 39% oil and 15% coal.

Each megawatt-hour carried about 1,543 lb of CO₂, 101% more carbon per megawatt-hour than the U.S. grid as a whole (765 lb).

Natural Gas 44%Oil 39%Coal 15%

Share of electricity generated in EPA's Puerto Rico grid region (PRMS) in 2023, from eGRID. 17.5 TWh from 62 plants.

Other data centers within 5 miles

Data centerOperatorRoof areaDistance
Claro data center, Apo AaClaro0.5 ac4.3 mi

More

Data centers in Puerto Rico · All Microsoft data centers · U.S. data center map

About this data

The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.

The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.

How the power-plant data is built · Data centers near me