Data Centers in Puerto Rico

2 data centers mapped in Puerto Rico: 2 buildings covering about 1 acres of roof. Most sit in EPA's Puerto Rico grid region, whose electricity is 44% natural gas, 39% oil and 15% coal, at 1,543 lb of CO₂ per megawatt-hour, 101% more carbon per megawatt-hour than the U.S. grid as a whole (765 lb).

Sites2mapped data centers
Buildings2mapped footprints
Roof area0.5 acbuilding footprints
Counties2with a data center

Map of data centers in Puerto Rico

Data centerUnder construction

What powers Puerto Rico's data centers

A data center draws from its regional grid, not from one plant. These are the grid regions Puerto Rico's data centers sit in, and what those regions generate:

Puerto Rico · 2 sites

1,543 lb CO₂ per MWh, 101% more carbon per megawatt-hour than the U.S. grid as a whole (765 lb).

Natural Gas 44%Oil 39%Coal 15%

Share of electricity generated in EPA's Puerto Rico grid region (PRMS) in 2023, from eGRID. 17.5 TWh from 62 plants.

All power plants in Puerto Rico →

By county

Operators

Claro (1) · Microsoft (1)

Every mapped data center in Puerto Rico

Data centerOperatorCity · CountyRoof area
Claro data center, Apo AaClaroApo Aa · San Juan0.5 ac
Microsoft data center, GuaynaboMicrosoftGuaynabo · Guaynabo—

About this data

The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.

The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.

How the power-plant data is built · Data centers near me