Microsoft data center, Atlanta is a data center in Atlanta, Fulton County, Georgia. It is mapped as 1 building covering about 31,000 sq ft. Its power comes off the Southeast grid (Southern Company), which runs on 55% natural gas, 20% nuclear and 15% coal.
This data centerOther data centersPower plants (colored by fuel)
| Address | 6050 Fulton Industrial Boulevard Southwest, Atlanta GA 30336 |
|---|---|
| County | Fulton County, Georgia |
| Coordinates | 33.71815, -84.58485 |
| On OpenStreetMap | way/1562013259 |
A data center doesn't run on the nearest power plant. It draws from the regional grid, where electricity from every plant on the system mixes. This site is in EPA's Southeast grid region, and the county's largest utility is on the Southern Company grid. In 2023, the region's electricity was 55% natural gas, 20% nuclear, 15% coal and 4% solar.
Each megawatt-hour carried about 840 lb of CO₂, close to the U.S. grid as a whole (765 lb).
Share of electricity generated in EPA's Southeast grid region (SRSO) in 2023, from eGRID. 257 TWh from 338 plants.
| Utility | Business rate | Industrial rate |
|---|---|---|
| Georgia Power Co | 11.7¢ | 7.1¢ |
| Cobb Electric Membership Corp | 10.2¢ | 8.0¢ |
| Sawnee Electric Membership Corporation | 10.8¢ | 7.5¢ |
| GreyStone Power Corporation | 12.8¢ | 9.0¢ |
| Coweta-Fayette El Member Corp | 13.4¢ | 7.8¢ |
| City of East Point - (GA) | 9.2¢ | — |
| City of College Park - (GA) | 8.1¢ | — |
Utilities that report serving Fulton County to the EIA (Form 861, 2024), largest first. Rates are each utility's average revenue per kilowatt-hour from commercial and from industrial customers across the state in 2024; a large data center usually negotiates its own contract.
| Plant | Fuel | Capacity | Distance |
|---|---|---|---|
| Turnipseed Solar, LLC | Solar | 3.0 MW | 5.6 mi |
| Jack McDonough | Natural Gas | 2,848 MW | 9.6 mi |
| Atlanta Falcons Solar | Solar | 1.0 MW | 10.9 mi |
| Inforum | Oil | 1.3 MW | 11.5 mi |
| Atlanta Gift Mart LP | Oil | 1.2 MW | 11.6 mi |
| Georgia Pacific Center | Oil | 1.4 MW | 11.7 mi |
| 191 Peachtree Tower | Oil | 2.4 MW | 11.7 mi |
| Sun Trust Plaza | Oil | 2.4 MW | 11.8 mi |
| MAS ASB Cogen Plant | Natural Gas | 6.6 MW | 11.8 mi |
| Tech Square Microgrid | Natural Gas | 1.4 MW | 11.9 mi |
The largest power plant within 50 miles is Bowen, a 3,499 MW coal plant 34 miles away.
Operating plants from EIA Form 860, by straight-line distance. Being close doesn't mean a plant supplies the site.
| Data center | Roof area | Distance |
|---|---|---|
| Douglasville 2 | 7.1 ac | 1.8 mi |
| Atlanta, GA | 1.8 ac | 1.8 mi |
| Centersquare Atlanta ATL1 | 5.7 ac | 1.8 mi |
| Digital Realty Atlanta ATL11 | 7.2 ac | 2.0 mi |
| Douglasville 1 | 4.9 ac | 2.0 mi |
| Aligned Data Centers data center, Lithia Springs | 6.4 ac | 2.1 mi |
| Google data center, Atlanta | 17 ac | 2.2 mi |
| Douglasville | 12 ac | 2.4 mi |
| The Keep | 18 ac | 2.9 mi |
| Atlanta III | 11 ac | 3.2 mi |
| Stack Infrastructure data center, Lithia Springs | 6.5 ac | 3.2 mi |
Data centers in Georgia · Data centers in Fulton County · All Microsoft data centers · U.S. data center map
The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.
The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.