19 data centers are mapped in Fulton County, Georgia: 20 buildings covering about 58.8 acres (2,563,000 sq ft) of roof. Operators include Digital Realty, Microsoft, Quality Technology Services, Ascent. The county is in EPA's Southeast grid region, whose electricity is 55% natural gas, 20% nuclear and 15% coal, at 840 lb of CO₂ per megawatt-hour.
Data centerUnder constructionPower plant (colored by fuel)
| Data center | City | Roof area |
|---|---|---|
| QTS Atlanta Data Center 1 | Atlanta | 16 ac |
| Data center, Atlanta | Atlanta | 9.5 ac |
| QTS Atlanta Data Center 2 | Atlanta | 6.3 ac |
| Microsoft data center, Red Oak | Red Oak | 5.7 ac |
| Secure Data Center | Alpharetta | 4.2 ac |
| Digital Realty Data Center | Atlanta | 2.9 ac |
| Cox Data Center | Roswell | 2.9 ac |
| Strategic Datasphere | Alpharetta | 2.9 ac |
| Mapletree Industrial | Alpharetta | 2.7 ac |
| T5 Data Center | Alpharetta | 2.3 ac |
| Flexential Atlanta - Alpharetta Data Center | Alpharetta | 1.7 ac |
| Microsoft data center, Atlanta | Atlanta | 0.7 ac |
| CenturyLink data center, Atlanta | Atlanta | 0.5 ac |
| Google Fiber | Atlanta | — |
| Atlanta ATL13 | Atlanta | — |
| CoreSite AT1 | Atlanta | — |
| Hewlett-Packard | Alpharetta | — |
| Ascent - Atlanta Data Center | Alpharetta | — |
| Data center, Alpharetta | Alpharetta | — |
Data centers in Fulton County draw from the regional grid. In 2023, electricity in EPA's Southeast region was 55% natural gas, 20% nuclear, 15% coal and 4% solar, at 840 lb of CO₂ per megawatt-hour, close to the U.S. grid as a whole (765 lb).
Share of electricity generated in EPA's Southeast grid region (SRSO) in 2023, from eGRID. 257 TWh from 338 plants.
| Utility | Business rate | Industrial rate |
|---|---|---|
| Georgia Power Co | 11.7¢ | 7.1¢ |
| Cobb Electric Membership Corp | 10.2¢ | 8.0¢ |
| Sawnee Electric Membership Corporation | 10.8¢ | 7.5¢ |
| GreyStone Power Corporation | 12.8¢ | 9.0¢ |
| Coweta-Fayette El Member Corp | 13.4¢ | 7.8¢ |
| City of East Point - (GA) | 9.2¢ | — |
| City of College Park - (GA) | 8.1¢ | — |
Utilities that report serving Fulton County to the EIA (Form 861, 2024), largest first. Rates are each utility's average revenue per kilowatt-hour from commercial and from industrial customers across the state in 2024; a large data center usually negotiates its own contract.
| Plant | Fuel | Capacity |
|---|---|---|
| Morgan Falls | Hydroelectric | 16.8 MW |
| State Farm Support Center East | Oil | 10.8 MW |
| MAS ASB Cogen Plant | Natural Gas | 6.6 MW |
| Shepherd Center | Oil | 6.0 MW |
| Hewlett Packard Enterprise | Oil | 5.0 MW |
| Bank of America Plaza | Oil | 3.0 MW |
| 191 Peachtree Tower | Oil | 2.4 MW |
| Sun Trust Plaza | Oil | 2.4 MW |
| Georgia Pacific Center | Oil | 1.4 MW |
| Tech Square Microgrid | Natural Gas | 1.4 MW |
| Inforum | Oil | 1.3 MW |
| Atlanta Gift Mart LP | Oil | 1.2 MW |
| Atlanta Falcons Solar | Solar | 1.0 MW |
The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.
The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.