Data Centers in Fulton County, GA

19 data centers are mapped in Fulton County, Georgia: 20 buildings covering about 58.8 acres (2,563,000 sq ft) of roof. Operators include Digital Realty, Microsoft, Quality Technology Services, Ascent. The county is in EPA's Southeast grid region, whose electricity is 55% natural gas, 20% nuclear and 15% coal, at 840 lb of CO₂ per megawatt-hour.

Sites19mapped data centers
Buildings20mapped footprints
Roof area59 acbuilding footprints
GridSouthern Companylargest utility's grid

Map

Data centerUnder constructionPower plant (colored by fuel)

Data centers in Fulton County

Data centerOperatorCityRoof area
QTS Atlanta Data Center 1Quality Technology ServicesAtlanta16 ac
Data center, AtlantaOperator not recordedAtlanta9.5 ac
QTS Atlanta Data Center 2Quality Technology ServicesAtlanta6.3 ac
Microsoft data center, Red OakMicrosoftRed Oak5.7 ac
Secure Data CenterOperator not recordedAlpharetta4.2 ac
Digital Realty Data CenterDigital RealtyAtlanta2.9 ac
Cox Data CenterOperator not recordedRoswell2.9 ac
Strategic DatasphereOperator not recordedAlpharetta2.9 ac
Mapletree IndustrialOperator not recordedAlpharetta2.7 ac
T5 Data CenterOperator not recordedAlpharetta2.3 ac
Flexential Atlanta - Alpharetta Data CenterFlexentialAlpharetta1.7 ac
Microsoft data center, AtlantaMicrosoftAtlanta0.7 ac
CenturyLink data center, AtlantaCenturyLinkAtlanta0.5 ac
Google FiberGoogleAtlanta—
Atlanta ATL13Digital RealtyAtlanta—
CoreSite AT1CoreSiteAtlanta—
Hewlett-PackardOperator not recordedAlpharetta—
Ascent - Atlanta Data CenterAscentAlpharetta—
Data center, AlpharettaOperator not recordedAlpharetta—

What the grid here generates

Data centers in Fulton County draw from the regional grid. In 2023, electricity in EPA's Southeast region was 55% natural gas, 20% nuclear, 15% coal and 4% solar, at 840 lb of CO₂ per megawatt-hour, close to the U.S. grid as a whole (765 lb).

Natural Gas 55%Nuclear 20%Coal 15%Solar 4%Biomass 4%Hydroelectric 3%

Share of electricity generated in EPA's Southeast grid region (SRSO) in 2023, from eGRID. 257 TWh from 338 plants.

Utilities that serve Fulton County

UtilityTypeGridBusiness rateIndustrial rate
Georgia Power CoInvestor OwnedSouthern Company11.7¢7.1¢
Cobb Electric Membership CorpCooperativeSouthern Company10.2¢8.0¢
Sawnee Electric Membership CorporationCooperativeSouthern Company10.8¢7.5¢
GreyStone Power CorporationCooperativeSouthern Company12.8¢9.0¢
Coweta-Fayette El Member CorpCooperativeSouthern Company13.4¢7.8¢
City of East Point - (GA)MunicipalSouthern Company9.2¢—
City of College Park - (GA)MunicipalSouthern Company8.1¢—

Utilities that report serving Fulton County to the EIA (Form 861, 2024), largest first. Rates are each utility's average revenue per kilowatt-hour from commercial and from industrial customers across the state in 2024; a large data center usually negotiates its own contract.

Power plants in Fulton County

PlantFuelCapacity
Morgan FallsHydroelectric16.8 MW
State Farm Support Center EastOil10.8 MW
MAS ASB Cogen PlantNatural Gas6.6 MW
Shepherd CenterOil6.0 MW
Hewlett Packard EnterpriseOil5.0 MW
Bank of America PlazaOil3.0 MW
191 Peachtree TowerOil2.4 MW
Sun Trust PlazaOil2.4 MW
Georgia Pacific CenterOil1.4 MW
Tech Square MicrogridNatural Gas1.4 MW
InforumOil1.3 MW
Atlanta Gift Mart LPOil1.2 MW
Atlanta Falcons SolarSolar1.0 MW

All power plants in Fulton County →

About this data

The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.

The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.

How the power-plant data is built · Data centers near me