Flexential Atlanta - Alpharetta Data Center

Flexential Atlanta - Alpharetta Data Center is a data center in Alpharetta, Fulton County, Georgia. It is mapped as 1 building covering about 1.7 acres (76,000 sq ft). Its power comes off the Southeast grid (Southern Company), which runs on 55% natural gas, 20% nuclear and 15% coal.

OperatorFlexentialas mapped
Roof area1.7 ac1 building
Grid CO₂840 lbper MWh, SRSO region
Nearest plant0.4 miState Farm Support Center…

Location

This data centerOther data centersPower plants (colored by fuel)

Address12655 Edison Drive, Alpharetta GA 30022
CountyFulton County, Georgia
Coordinates34.08709, -84.25197
Websitewww.flexential.com/data-centers/ga/atlanta/alpharetta-data-…
On OpenStreetMapway/39083797

What powers Flexential Atlanta - Alpharetta Data Center

A data center doesn't run on the nearest power plant. It draws from the regional grid, where electricity from every plant on the system mixes. This site is in EPA's Southeast grid region, and the county's largest utility is on the Southern Company grid. In 2023, the region's electricity was 55% natural gas, 20% nuclear, 15% coal and 4% solar.

Each megawatt-hour carried about 840 lb of CO₂, close to the U.S. grid as a whole (765 lb).

Natural Gas 55%Nuclear 20%Coal 15%Solar 4%Biomass 4%Hydroelectric 3%

Share of electricity generated in EPA's Southeast grid region (SRSO) in 2023, from eGRID. 257 TWh from 338 plants.

Utilities that serve Fulton County

UtilityTypeGridBusiness rateIndustrial rate
Georgia Power CoInvestor OwnedSouthern Company11.7¢7.1¢
Cobb Electric Membership CorpCooperativeSouthern Company10.2¢8.0¢
Sawnee Electric Membership CorporationCooperativeSouthern Company10.8¢7.5¢
GreyStone Power CorporationCooperativeSouthern Company12.8¢9.0¢
Coweta-Fayette El Member CorpCooperativeSouthern Company13.4¢7.8¢
City of East Point - (GA)MunicipalSouthern Company9.2¢—
City of College Park - (GA)MunicipalSouthern Company8.1¢—

Utilities that report serving Fulton County to the EIA (Form 861, 2024), largest first. Rates are each utility's average revenue per kilowatt-hour from commercial and from industrial customers across the state in 2024; a large data center usually negotiates its own contract.

Nearest power plants

PlantFuelCapacityDistance
State Farm Support Center EastOil10.8 MW0.4 mi
Hewlett Packard EnterpriseOil5.0 MW0.9 mi
Morgan FallsHydroelectric16.8 MW11.2 mi
BufordHydroelectric131 MW11.3 mi
Georgia LFG Richland Creek PlantBiomass11.2 MW12.8 mi
McGrau Ford Battery Storage FacilityBattery Storage530 MW17.0 mi
Riverwood 100 BuildingOil1.1 MW18.8 mi
Solar BESS HybridSolar3.5 MW18.9 mi
Emory Decatur HospitalOil3.9 MW20.5 mi
Shepherd CenterOil6.0 MW20.7 mi

The largest power plant within 50 miles is Bowen, a 3,499 MW coal plant 38 miles away.

Operating plants from EIA Form 860, by straight-line distance. Being close doesn't mean a plant supplies the site.

Other data centers within 5 miles

Data centerOperatorRoof areaDistance
Secure Data CenterOperator not recorded4.2 ac0.5 mi
Hewlett-PackardOperator not recorded—0.9 mi
Mapletree IndustrialOperator not recorded2.7 ac1.1 mi
T5 Data CenterOperator not recorded2.3 ac1.1 mi
Strategic DatasphereOperator not recorded2.9 ac1.1 mi
Data center, AlpharettaOperator not recorded—2.2 mi
UPS Data CenterOperator not recorded4.0 ac2.4 mi
Ascent - Atlanta Data CenterAscent—2.4 mi

More

Data centers in Georgia · Data centers in Fulton County · All Flexential data centers · U.S. data center map

About this data

The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.

The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.

How the power-plant data is built · Data centers near me