CenturyLink data center, Atlanta

CenturyLink data center, Atlanta is a data center in Atlanta, Fulton County, Georgia. It is mapped as 1 building covering about 22,900 sq ft. Its power comes off the Southeast grid (Southern Company), which runs on 55% natural gas, 20% nuclear and 15% coal.

OperatorCenturyLinkas mapped
Roof area0.5 ac1 building
Grid CO₂840 lbper MWh, SRSO region
Nearest plant0.3 miSun Trust Plaza

Location

This data centerOther data centersPower plants (colored by fuel)

CountyFulton County, Georgia
Coordinates33.76511, -84.38373
On OpenStreetMapway/536784688

What powers CenturyLink data center, Atlanta

A data center doesn't run on the nearest power plant. It draws from the regional grid, where electricity from every plant on the system mixes. This site is in EPA's Southeast grid region, and the county's largest utility is on the Southern Company grid. In 2023, the region's electricity was 55% natural gas, 20% nuclear, 15% coal and 4% solar.

Each megawatt-hour carried about 840 lb of CO₂, close to the U.S. grid as a whole (765 lb).

Natural Gas 55%Nuclear 20%Coal 15%Solar 4%Biomass 4%Hydroelectric 3%

Share of electricity generated in EPA's Southeast grid region (SRSO) in 2023, from eGRID. 257 TWh from 338 plants.

Utilities that serve Fulton County

UtilityTypeGridBusiness rateIndustrial rate
Georgia Power CoInvestor OwnedSouthern Company11.7¢7.1¢
Cobb Electric Membership CorpCooperativeSouthern Company10.2¢8.0¢
Sawnee Electric Membership CorporationCooperativeSouthern Company10.8¢7.5¢
GreyStone Power CorporationCooperativeSouthern Company12.8¢9.0¢
Coweta-Fayette El Member CorpCooperativeSouthern Company13.4¢7.8¢
City of East Point - (GA)MunicipalSouthern Company9.2¢—
City of College Park - (GA)MunicipalSouthern Company8.1¢—

Utilities that report serving Fulton County to the EIA (Form 861, 2024), largest first. Rates are each utility's average revenue per kilowatt-hour from commercial and from industrial customers across the state in 2024; a large data center usually negotiates its own contract.

Nearest power plants

PlantFuelCapacityDistance
Sun Trust PlazaOil2.4 MW0.3 mi
Bank of America PlazaOil3.0 MW0.4 mi
Atlanta Gift Mart LPOil1.2 MW0.4 mi
191 Peachtree TowerOil2.4 MW0.5 mi
Georgia Pacific CenterOil1.4 MW0.6 mi
Tech Square MicrogridNatural Gas1.4 MW0.8 mi
InforumOil1.3 MW0.9 mi
Atlanta Falcons SolarSolar1.0 MW1.2 mi
Shepherd CenterOil6.0 MW3.2 mi
Emory Decatur HospitalOil3.9 MW6.1 mi

The largest power plant within 50 miles is Bowen, a 3,499 MW coal plant 40 miles away.

Operating plants from EIA Form 860, by straight-line distance. Being close doesn't mean a plant supplies the site.

Other data centers within 5 miles

Data centerOperatorRoof areaDistance
CoreSite AT1CoreSite—0.8 mi
Atlanta ATL13Digital Realty—0.8 mi
Google FiberGoogle—1.1 mi
QTS Atlanta Data Center 2Quality Technology Services6.3 ac2.2 mi
QTS Atlanta Data Center 1Quality Technology Services16 ac2.3 mi
Data center, AtlantaOperator not recorded9.5 ac2.5 mi

More

Data centers in Georgia · Data centers in Fulton County · All CenturyLink data centers · U.S. data center map

About this data

The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.

The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.

How the power-plant data is built · Data centers near me