Centurylink Data Centers

7 Centurylink data centers are mapped in the U.S. on OpenStreetMap, in 6 states: 7 buildings covering about 4.7 acres (206,000 sq ft) of roof. Weighted by building size, the grids they sit on average 557 lb of CO₂ per megawatt-hour, 27% cleaner than the U.S. grid as a whole (765 lb).

Sites7mapped
States6with a site
Buildings7mapped footprints
Roof area4.7 acbuilding footprints

Map of Centurylink data centers

Data centerUnder construction

By grid region

Grid regionSitesCO₂ lb/MWhLargest sources
Southwest (Arizona/New Mexico)270349% natural gas, 18% nuclear and 11% coal
California242643% natural gas, 20% solar and 14% hydroelectric
Northwest163139% hydroelectric, 25% natural gas and 16% coal
Southeast184055% natural gas, 20% nuclear and 15% coal
Kansas/Missouri186140% wind, 32% coal and 14% nuclear

Every mapped site

Data centerPlaceGrid regionRoof area
Centurylink data center, 200 North Nash Street, El SegundoEl Segundo, CaliforniaCalifornia1.6 ac
Centurylink data center, BurbankBurbank, CaliforniaCalifornia1.0 ac
CenturyLink data center, AtlantaAtlanta, GeorgiaSoutheast0.5 ac
CenturyLink data center, HamiltonHamilton, MissouriKansas/Missouri0.0 ac
CenturyLink data center, Las CrucesLas Cruces, New MexicoSouthwest (Arizona/New Mexico)0.7 ac
CenturyLink data center, Las VegasLas Vegas, NevadaSouthwest (Arizona/New Mexico)0.3 ac
CenturyLink data center, SalemSalem, OregonNorthwest0.6 ac

About this data

The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.

The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.

How the power-plant data is built · Data centers near me