Centurylink data center, 200 North Nash Street, El Segundo

Centurylink data center, 200 North Nash Street, El Segundo is a data center in El Segundo, Los Angeles County, California. It is mapped as 1 building covering about 1.6 acres (71,000 sq ft). Its power comes off the California grid (California ISO), which runs on 43% natural gas, 20% solar and 14% hydroelectric.

OperatorCenturylinkas mapped
Roof area1.6 ac1 building
Grid CO₂426 lbper MWh, CAMX region
Nearest plant0.2 miEquinix Douglas St. Fuel …

Location

This data centerOther data centersPower plants (colored by fuel)

Address200 North Nash Street, El Segundo CA 90245
CountyLos Angeles County, California
Coordinates33.91775, -118.38592
Opened1976 (as mapped)
On OpenStreetMapway/424945736

What powers Centurylink data center, 200 North Nash Street, El Segundo

A data center doesn't run on the nearest power plant. It draws from the regional grid, where electricity from every plant on the system mixes. This site is in EPA's California grid region, and the county's largest utility is on the California ISO grid. In 2023, the region's electricity was 43% natural gas, 20% solar, 14% hydroelectric and 8% nuclear.

Each megawatt-hour carried about 426 lb of CO₂, 44% cleaner than the U.S. grid as a whole (765 lb).

Natural Gas 43%Solar 20%Hydroelectric 14%Nuclear 8%Wind 7%Geothermal 4%Biomass 2%Coal 2%

Share of electricity generated in EPA's California grid region (CAMX) in 2023, from eGRID. 222 TWh from 1,674 plants.

Utilities that serve Los Angeles County

UtilityTypeGridBusiness rateIndustrial rate
Southern California Edison CoInvestor OwnedCalifornia ISO23.1¢20.6¢
Los Angeles Department of Water & PowerMunicipalLA Dept. of Water & Power21.9¢20.7¢
City of Glendale - (CA)MunicipalLA Dept. of Water & Power24.9¢22.4¢
City of Pasadena - (CA)MunicipalCalifornia ISO23.4¢—
City of Burbank Water and PowerMunicipalLA Dept. of Water & Power18.1¢—
City of AzusaMunicipalCalifornia ISO18.8¢17.0¢
City of VernonMunicipalCalifornia ISO22.3¢16.6¢

Utilities that report serving Los Angeles County to the EIA (Form 861, 2024), largest first. Rates are each utility's average revenue per kilowatt-hour from commercial and from industrial customers across the state in 2024; a large data center usually negotiates its own contract.

Nearest power plants

PlantFuelCapacityDistance
Equinix Douglas St. Fuel CellNatural Gas2.0 MW0.2 mi
Equinix Maple Ave. Fuel CellNatural Gas2.0 MW0.7 mi
El Segundo CogenNatural Gas180 MW1.3 mi
Central Utilities Plant LAX 2Natural Gas9.2 MW2.1 mi
El Segundo Energy Center LLCNatural Gas537 MW2.3 mi
LAX Rental Car Center Solar Power PlantSolar4.8 MW2.3 mi
ScattergoodNatural Gas876 MW2.4 mi
Hyperion Treatment Plant CHP PlantBiomass33.0 MW2.6 mi
AT&T - HawthorneNatural Gas1.0 MW3.8 mi
DirecTV - Los AngelesNatural Gas1.0 MW5.1 mi

The largest power plant within 50 miles is Haynes, a 1,739 MW natural gas plant 20 miles away.

Operating plants from EIA Form 860, by straight-line distance. Being close doesn't mean a plant supplies the site.

Other data centers within 5 miles

Data centerOperatorRoof areaDistance
DRT LAX12Digital Realty2.6 ac0.2 mi
Serverfarm - LAX1Serverfarm LLC.2.7 ac0.3 mi

More

Data centers in California · Data centers in Los Angeles County · All Centurylink data centers · U.S. data center map

About this data

The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.

The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.

How the power-plant data is built · Data centers near me