10 data centers are mapped in Los Angeles County, California: 10 buildings covering about 15.6 acres (679,000 sq ft) of roof. Operators include Centurylink, CoreSite, Digital Realty, Equinix. The county is in EPA's California grid region, whose electricity is 43% natural gas, 20% solar and 14% hydroelectric, at 426 lb of CO₂ per megawatt-hour.

Sites10mapped data centers
Buildings10mapped footprints
Roof area16 acbuilding footprints
GridCalifornia ISOlargest utility's grid

Map

Data centerUnder constructionPower plant (colored by fuel)

Data centers in Los Angeles County

Data centerOperatorCityRoof area
Serverfarm - LAX1Serverfarm LLC.El Segundo2.7 ac
DRT LAX12Digital RealtyEl Segundo2.6 ac
Equinix data center, TorranceEquinixTorrance2.5 ac
USPO Terminal AnnexUnited States Postal ServiceLos Angeles2.3 ac
Centurylink data center, 200 North Nash Street, El SegundoCenturylinkEl Segundo1.6 ac
DRT LAX10Operator not recordedLos Angeles1.5 ac
One WilshireOperator not recordedLos Angeles1.0 ac
Centurylink data center, BurbankCenturylinkBurbank1.0 ac
AT&TOperator not recordedPalmdale0.4 ac
CoreSite - LA2CoreSiteLos Angeles—

What the grid here generates

Data centers in Los Angeles County draw from the regional grid. In 2023, electricity in EPA's California region was 43% natural gas, 20% solar, 14% hydroelectric and 8% nuclear, at 426 lb of CO₂ per megawatt-hour, 44% cleaner than the U.S. grid as a whole (765 lb).

Natural Gas 43%Solar 20%Hydroelectric 14%Nuclear 8%Wind 7%Geothermal 4%Biomass 2%Coal 2%

Share of electricity generated in EPA's California grid region (CAMX) in 2023, from eGRID. 222 TWh from 1,674 plants.

Utilities that serve Los Angeles County

UtilityTypeGridBusiness rateIndustrial rate
Southern California Edison CoInvestor OwnedCalifornia ISO23.1¢20.6¢
Los Angeles Department of Water & PowerMunicipalLA Dept. of Water & Power21.9¢20.7¢
City of Glendale - (CA)MunicipalLA Dept. of Water & Power24.9¢22.4¢
City of Pasadena - (CA)MunicipalCalifornia ISO23.4¢—
City of Burbank Water and PowerMunicipalLA Dept. of Water & Power18.1¢—
City of AzusaMunicipalCalifornia ISO18.8¢17.0¢
City of VernonMunicipalCalifornia ISO22.3¢16.6¢

Utilities that report serving Los Angeles County to the EIA (Form 861, 2024), largest first. Rates are each utility's average revenue per kilowatt-hour from commercial and from industrial customers across the state in 2024; a large data center usually negotiates its own contract.

Power plants in Los Angeles County

PlantFuelCapacity
HaynesNatural Gas1,739 MW
CastaicHydroelectric1,682 MW
AES Alamitos LLCNatural Gas1,115 MW
ScattergoodNatural Gas876 MW
Valley (CA)Natural Gas691 MW
AES Alamitos Energy CenterNatural Gas678 MW
HarborNatural Gas548 MW
El Segundo Energy Center LLCNatural Gas537 MW
Walnut Creek Energy ParkNatural Gas500 MW
Watson CogenerationNatural Gas405 MW
Magnolia Power ProjectNatural Gas388 MW
GlenarmNatural Gas266 MW
AV Solar Ranch OneSolar253 MW
Long Beach GenerationNatural Gas252 MW
Raceway Solar & StorageSolar205 MW

All power plants in Los Angeles County →

About this data

The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.

The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.