10 data centers are mapped in Los Angeles County, California: 10 buildings covering about 15.6 acres (679,000 sq ft) of roof. Operators include Centurylink, CoreSite, Digital Realty, Equinix. The county is in EPA's California grid region, whose electricity is 43% natural gas, 20% solar and 14% hydroelectric, at 426 lb of CO₂ per megawatt-hour.
Data centerUnder constructionPower plant (colored by fuel)
| Data center | City | Roof area |
|---|---|---|
| Serverfarm - LAX1 | El Segundo | 2.7 ac |
| DRT LAX12 | El Segundo | 2.6 ac |
| Equinix data center, Torrance | Torrance | 2.5 ac |
| USPO Terminal Annex | Los Angeles | 2.3 ac |
| Centurylink data center, 200 North Nash Street, El Segundo | El Segundo | 1.6 ac |
| DRT LAX10 | Los Angeles | 1.5 ac |
| One Wilshire | Los Angeles | 1.0 ac |
| Centurylink data center, Burbank | Burbank | 1.0 ac |
| AT&T | Palmdale | 0.4 ac |
| CoreSite - LA2 | Los Angeles | — |
Data centers in Los Angeles County draw from the regional grid. In 2023, electricity in EPA's California region was 43% natural gas, 20% solar, 14% hydroelectric and 8% nuclear, at 426 lb of CO₂ per megawatt-hour, 44% cleaner than the U.S. grid as a whole (765 lb).
Share of electricity generated in EPA's California grid region (CAMX) in 2023, from eGRID. 222 TWh from 1,674 plants.
| Utility | Business rate | Industrial rate |
|---|---|---|
| Southern California Edison Co | 23.1¢ | 20.6¢ |
| Los Angeles Department of Water & Power | 21.9¢ | 20.7¢ |
| City of Glendale - (CA) | 24.9¢ | 22.4¢ |
| City of Pasadena - (CA) | 23.4¢ | — |
| City of Burbank Water and Power | 18.1¢ | — |
| City of Azusa | 18.8¢ | 17.0¢ |
| City of Vernon | 22.3¢ | 16.6¢ |
Utilities that report serving Los Angeles County to the EIA (Form 861, 2024), largest first. Rates are each utility's average revenue per kilowatt-hour from commercial and from industrial customers across the state in 2024; a large data center usually negotiates its own contract.
| Plant | Fuel | Capacity |
|---|---|---|
| Haynes | Natural Gas | 1,739 MW |
| Castaic | Hydroelectric | 1,682 MW |
| AES Alamitos LLC | Natural Gas | 1,115 MW |
| Scattergood | Natural Gas | 876 MW |
| Valley (CA) | Natural Gas | 691 MW |
| AES Alamitos Energy Center | Natural Gas | 678 MW |
| Harbor | Natural Gas | 548 MW |
| El Segundo Energy Center LLC | Natural Gas | 537 MW |
| Walnut Creek Energy Park | Natural Gas | 500 MW |
| Watson Cogeneration | Natural Gas | 405 MW |
| Magnolia Power Project | Natural Gas | 388 MW |
| Glenarm | Natural Gas | 266 MW |
| AV Solar Ranch One | Solar | 253 MW |
| Long Beach Generation | Natural Gas | 252 MW |
| Raceway Solar & Storage | Solar | 205 MW |
The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.
The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.