Northlake 3-SLCHI303 is a solar power plant in Illinois with a nameplate capacity of 1.6 MW.
The 1.6 MW is nameplate capacity: the most this plant's generators are rated to produce, not what it actually generates. EPA eGRID reports no positive net generation for it this year.
How it works
Why the numbers look like this: panels make nothing at night and less in winter, so even a well-placed U.S. solar farm averages around a quarter of its nameplate over a year. Watch the monthly bars: they swell in summer and shrink in December.
This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.
| Address | 200 Champion Way |
|---|---|
| City | Northlake |
| County | Cook County |
| State | Illinois |
| ZIP | 60164 |
| Coordinates | 41.91853, -87.90930 |
| Operator | Prologis Logistics Services Incorporated |
| ID | Technology | Fuel | Nameplate capacity | Status | Online |
|---|---|---|---|---|---|
| CH303 | Solar Photovoltaic | Solar | 1.6 MW | Under Construction | — |
| NERC Region | RFC |
|---|---|
| Balancing Authority | PJM Interconnection, LLC |
Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.
| Data center | Distance |
|---|---|
| Aligned Data Center - Chicago ORD-01 | 0.5 mi |
| Microsoft - Azure Datacenter | 0.6 mi |
| Aligned Data Center - Chicago ORD-02 | 0.6 mi |
| Data center, Melrose Park | 1.1 mi |
| Digital Realty Chicago ORD12 | 2.7 mi |
| Element Critical CH2 | 4.9 mi |
| Element Critical CH1 | 4.9 mi |
| CyrusOne CHI6 | 4.9 mi |
Data centers mapped on OpenStreetMap within 25 miles. A data center draws from the regional grid, so being near this plant doesn't mean it buys this plant's power. U.S. data center map