MTHS Co-Gen Buildings is a natural gas power plant in Illinois with a nameplate capacity of 1.2 MW.
The 1.2 MW is nameplate capacity: the most this plant's generators are rated to produce, not what it actually generates. EPA eGRID reports no positive net generation for it this year.
How it works
Why the numbers look like this: engines start in minutes and come in small blocks, so they show up at landfills, on islands and as backup or peaking units — places that need power in small, fast pieces.
This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.
| Address | 1131 South Dee Rd |
|---|---|
| City | Park Ridge |
| County | Cook County |
| State | Illinois |
| ZIP | 60068 |
| Coordinates | 42.00194, -87.85222 |
| Operator | Maine Township High School Dist 207 |
| ID | Technology | Fuel | Nameplate capacity | Status | Online |
|---|---|---|---|---|---|
| STH1 | Natural Gas Internal Combustion Engine | Natural Gas | 0.6 MW | Operating | 1992 |
| STH2 | Natural Gas Internal Combustion Engine | Natural Gas | 0.6 MW | Operating | 1992 |
| NERC Region | RFC |
|---|---|
| Balancing Authority | PJM Interconnection, LLC |
Natural gas plants are the workhorse of the modern grid. Combined-cycle units achieve very high efficiency and can ramp up and down quickly to balance variable renewables. They emit roughly half the CO₂ per MWh of coal and far less of other pollutants, but they still release upstream methane during fuel extraction.
| Data center | Distance |
|---|---|
| EdgeConneX CHI01 | 5.1 mi |
| Stream Chicago I | 5.1 mi |
| EdgeConneX CHI02 | 5.2 mi |
| Stream Data Centers data center, Elk Grove Village under construction | 5.2 mi |
| EdgeConneX Data Center under construction | 5.2 mi |
| Equinix Chicago CH3 | 5.3 mi |
| Stream Chicago II | 5.4 mi |
| Digital Realty CH2 | 5.5 mi |
Data centers mapped on OpenStreetMap within 25 miles. A data center draws from the regional grid, so being near this plant doesn't mean it buys this plant's power. U.S. data center map