20 CoreSite data centers are mapped in the U.S. on OpenStreetMap, in 7 states: 21 buildings covering about 29.9 acres (1,301,000 sq ft) of roof. Weighted by building size, the grids they sit on average 568 lb of CO₂ per megawatt-hour, 26% cleaner than the U.S. grid as a whole (765 lb).
Data centerUnder construction
| Grid region | Sites | CO₂ lb/MWh |
|---|---|---|
| California | 9 | 426 |
| Mid-Atlantic | 6 | 594 |
| Southeast | 2 | 840 |
| Ohio Valley | 2 | 911 |
| New England | 1 | 537 |
| Data center | Place | Roof area |
|---|---|---|
| CoreSite SV6 | Santa Clara, California | 1.4 ac |
| CoreSite SV7 | Santa Clara, California | 1.4 ac |
| CoreSite SV9 | Santa Clara, California | 1.4 ac |
| CoreSite SV3 | Santa Clara, California | 1.3 ac |
| CoreSite SV4 | Santa Clara, California | 1.2 ac |
| CoreSite SV5 | Santa Clara, California | 1.2 ac |
| CoreSite SV8 | Santa Clara, California | 1.0 ac |
| San Jose Colocation Center | San Jose, California | — |
| CoreSite - LA2 | Los Angeles, California | — |
| CoreSite DC1 | Washington, District of Columbia | — |
| CoreSite AT2 - Marietta Data Center | Marietta, Georgia | 1.7 ac |
| CoreSite AT1 | Atlanta, Georgia | — |
| CoreSite Chicago Data Center (CH2) | Chicago, Illinois | 1.4 ac |
| CoreSite Chicago Data Center (CH1) | Chicago, Illinois | — |
| CoreSite BO1 | Somerville, Massachusetts | 3.1 ac |
| CoreSite Secaucus Campus | Secaucus, New Jersey | 3.4 ac |
| CoreSite NY3 | Secaucus, New Jersey | 1.7 ac |
| CoreSite VA3 | Reston, Virginia | 5.7 ac |
| CoreSite VA1 | Reston, Virginia | 3.2 ac |
| CoreSite VA2 | Reston, Virginia | 0.9 ac |
The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.
The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.