San Jose Colocation Center

San Jose Colocation Center is a data center run by CoreSite in San Jose, Santa Clara County, California. Its power comes off the California grid (California ISO), which runs on 43% natural gas, 20% solar and 14% hydroelectric.

OperatorCoreSiteas mapped
Grid CO₂426 lbper MWh, CAMX region
Nearest plant0.0 miCoreSite Real Estate 55 S…

Location

This data centerOther data centersPower plants (colored by fuel)

Address55 South Market Street, San Jose CA 95113
CountySanta Clara County, California
Coordinates37.33412, -121.89165
Websitewww.coresite.com/data-center/sv1-san-jose-ca
On OpenStreetMapnode/8897151054

What powers San Jose Colocation Center

A data center doesn't run on the nearest power plant. It draws from the regional grid, where electricity from every plant on the system mixes. This site is in EPA's California grid region, and the county's largest utility is on the California ISO grid. In 2023, the region's electricity was 43% natural gas, 20% solar, 14% hydroelectric and 8% nuclear.

Each megawatt-hour carried about 426 lb of CO₂, 44% cleaner than the U.S. grid as a whole (765 lb).

Natural Gas 43%Solar 20%Hydroelectric 14%Nuclear 8%Wind 7%Geothermal 4%Biomass 2%Coal 2%

Share of electricity generated in EPA's California grid region (CAMX) in 2023, from eGRID. 222 TWh from 1,674 plants.

Utilities that serve Santa Clara County

UtilityTypeGridBusiness rateIndustrial rate
Pacific Gas & Electric Co.Investor OwnedCalifornia ISO39.5¢33.1¢
City of Santa Clara - (CA)MunicipalCalifornia ISO22.1¢15.1¢
City of Palo Alto - (CA)MunicipalCalifornia ISO17.0¢19.0¢
WAPA-- Western Area Power AdministrationFederalWestern Area Power Administration - Desert Southwest Region4.6¢2.9¢

Utilities that report serving Santa Clara County to the EIA (Form 861, 2024), largest first. Rates are each utility's average revenue per kilowatt-hour from commercial and from industrial customers across the state in 2024; a large data center usually negotiates its own contract.

Nearest power plants

PlantFuelCapacityDistance
CoreSite Real Estate 55 S. Market StreetOil8.0 MW0.0 mi
CSU San Jose State UniversitySolar1.7 MW0.4 mi
San Jose CogenerationNatural Gas6.0 MW0.7 mi
SCC - San JoseNatural Gas1.0 MW1.4 mi
Kellogg's - San JoseNatural Gas1.1 MW1.9 mi
Verizon Comms Garage Top Solar ProjectSolar2.3 MW2.6 mi
SCU000 El Camino Real Fuel CellNatural Gas1.5 MW2.9 mi
Micro Santa ClaraNatural Gas3.0 MW3.1 mi
SC 1 Data Center, Phase 2Oil99.6 MW3.4 mi
Equinix Lundy Ave. Fuel CellNatural Gas4.9 MW3.8 mi

The largest power plant within 50 miles is Dynegy Moss Landing Power Plant Hybrid, a 1,848 MW natural gas plant 37 miles away.

Operating plants from EIA Form 860, by straight-line distance. Being close doesn't mean a plant supplies the site.

Other data centers within 5 miles

Data centerOperatorRoof areaDistance
Data center, 150 South 1st Street, San JoseOperator not recorded2.3 ac0.2 mi
Forescout Technologies, Inc.Operator not recorded—3.2 mi
Digital Realty Silicon Valley SC1Digital Realty9.3 ac3.4 mi
Microsoft data center, Santa ClaraMicrosoft3.8 ac3.6 mi
Vantage Santa Clara CA2Vantage Data Centers3.0 ac3.7 mi
Equinix San Jose SV3Equinix2.5 ac3.7 mi
STACK SVY02Stack Infrastructure3.1 ac3.9 mi
Digital Realty Silicon Valley SJC37Digital Realty3.6 ac4.0 mi
Silicon Valley SJC31Digital Realty3.3 ac4.1 mi
SV Colo data center, Santa ClaraSV Colo1.3 ac4.2 mi
NTT Silicon Valley SV1 Data CenterNTT0.9 ac4.3 mi
Digital Realty Silicon Valley SJC11Digital Realty1.0 ac4.3 mi
Cologix Santa Clara SV1 Data CenterCologix1.8 ac4.4 mi
Prime Santa ClaraPrime0.7 ac4.4 mi
Digital Realty Silicon Valley SJC10Digital Realty1.3 ac4.4 mi

And 16 more within 5 miles.

More

Data centers in California · Data centers in Santa Clara County · All CoreSite data centers · U.S. data center map

About this data

The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.

The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.

How the power-plant data is built · Data centers near me