Forescout Technologies, Inc.

Forescout Technologies, Inc. is a data center in San Jose, Santa Clara County, California. Its power comes off the California grid (California ISO), which runs on 43% natural gas, 20% solar and 14% hydroelectric.

OperatorOperator not recordedas mapped
Grid CO₂426 lbper MWh, CAMX region
Nearest plant1.9 miSCU000 El Camino Real Fue…

Location

This data centerOther data centersPower plants (colored by fuel)

Address300 Santana Row, San Jose CA 95128
CountySanta Clara County, California
Coordinates37.32287, -121.94742
Websitewww.forescout.com/
On OpenStreetMapnode/12550746951

What powers Forescout Technologies, Inc.

A data center doesn't run on the nearest power plant. It draws from the regional grid, where electricity from every plant on the system mixes. This site is in EPA's California grid region, and the county's largest utility is on the California ISO grid. In 2023, the region's electricity was 43% natural gas, 20% solar, 14% hydroelectric and 8% nuclear.

Each megawatt-hour carried about 426 lb of CO₂, 44% cleaner than the U.S. grid as a whole (765 lb).

Natural Gas 43%Solar 20%Hydroelectric 14%Nuclear 8%Wind 7%Geothermal 4%Biomass 2%Coal 2%

Share of electricity generated in EPA's California grid region (CAMX) in 2023, from eGRID. 222 TWh from 1,674 plants.

Utilities that serve Santa Clara County

UtilityTypeGridBusiness rateIndustrial rate
Pacific Gas & Electric Co.Investor OwnedCalifornia ISO39.5¢33.1¢
City of Santa Clara - (CA)MunicipalCalifornia ISO22.1¢15.1¢
City of Palo Alto - (CA)MunicipalCalifornia ISO17.0¢19.0¢
WAPA-- Western Area Power AdministrationFederalWestern Area Power Administration - Desert Southwest Region4.6¢2.9¢

Utilities that report serving Santa Clara County to the EIA (Form 861, 2024), largest first. Rates are each utility's average revenue per kilowatt-hour from commercial and from industrial customers across the state in 2024; a large data center usually negotiates its own contract.

Nearest power plants

PlantFuelCapacityDistance
SCU000 El Camino Real Fuel CellNatural Gas1.5 MW1.9 mi
Verizon Comms Garage Top Solar ProjectSolar2.3 MW2.4 mi
SC 1 Data Center, Phase 2Oil99.6 MW2.7 mi
AGT000 Stevens Creek Fuel CellNatural Gas2.2 MW2.8 mi
SCC - San JoseNatural Gas1.0 MW3.0 mi
CoreSite Real Estate 55 S. Market StreetOil8.0 MW3.2 mi
Apple Campus 2 PVSolar14.4 MW3.5 mi
Apple Campus 2 Fuel CellBiomass4.0 MW3.5 mi
CSU San Jose State UniversitySolar1.7 MW3.6 mi
Donald Von Raesfeld Power PlantNatural Gas154 MW3.7 mi

The largest power plant within 50 miles is Dynegy Moss Landing Power Plant Hybrid, a 1,848 MW natural gas plant 37 miles away.

Operating plants from EIA Form 860, by straight-line distance. Being close doesn't mean a plant supplies the site.

Other data centers within 5 miles

Data centerOperatorRoof areaDistance
Digital Realty Silicon Valley SC1Digital Realty9.3 ac2.7 mi
Microsoft data center, Santa ClaraMicrosoft3.8 ac2.7 mi
STACK SVY02Stack Infrastructure3.1 ac2.7 mi
Vantage Santa Clara CA2Vantage Data Centers3.0 ac2.8 mi
SV Colo data center, Santa ClaraSV Colo1.3 ac2.9 mi
Cologix Santa Clara SV1 Data CenterCologix1.8 ac3.0 mi
San Jose Colocation CenterCoreSite—3.2 mi
NTT Silicon Valley SV1 Data CenterNTT0.9 ac3.2 mi
Digital Realty Silicon Valley SJC37Digital Realty3.6 ac3.3 mi
Data center, 150 South 1st Street, San JoseOperator not recorded2.3 ac3.3 mi
Silicon Valley SJC31Digital Realty3.3 ac3.4 mi
Csquare SFO1Csquare4.0 ac3.5 mi
Prime Santa ClaraPrime0.7 ac3.6 mi
Digital Realty Silicon Valley SJC15Digital Realty0.6 ac3.6 mi
Digital Realty Silicon Valley SJC16Digital Realty1.0 ac3.6 mi

And 30 more within 5 miles.

More

Data centers in California · Data centers in Santa Clara County · U.S. data center map

About this data

The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.

The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.

How the power-plant data is built · Data centers near me