SCU000 El Camino Real Fuel Cell is a natural gas power plant in California with a nameplate capacity of 1.5 MW. It generates roughly 10.9k MWh per year — enough to power about 1,042 average U.S. homes.
Its capacity factor of 83% means it runs nearly around-the-clock as baseload generation.
Run flat out every hour of the year, SCU000 El Camino Real Fuel Cell could make 13.1k MWh. In 2023 it made 10.9k MWh — the same as running at full power 83 hours in every 100.
BaseloadCapacity factor 83%. It runs nearly around the clock.
This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.
| Address | 500 El Camino Real |
|---|---|
| City | Santa Clara |
| County | Santa Clara County |
| State | California |
| ZIP | 95053 |
| Coordinates | 37.34994, -121.94064 |
| Operator | 2016 ESA Project Company, LLC |
| ID | Technology | Fuel | Nameplate capacity | Status | Online |
|---|---|---|---|---|---|
| SCU00 | Other Natural Gas | Natural Gas | 1.5 MW | Operating | 2018 |
| NERC Region | WECC |
|---|---|
| Balancing Authority | California Independent System Operator |
Natural gas plants are the workhorse of the modern grid. Combined-cycle units achieve very high efficiency and can ramp up and down quickly to balance variable renewables. They emit roughly half the CO₂ per MWh of coal and far less of other pollutants, but they still release upstream methane during fuel extraction.
| Data center | Distance |
|---|---|
| Digital Realty Silicon Valley SC1 | 0.8 mi |
| Microsoft data center, Santa Clara | 0.9 mi |
| Vantage Santa Clara CA2 | 1.0 mi |
| STACK SVY02 | 1.1 mi |
| SV Colo data center, Santa Clara | 1.4 mi |
| Forescout Technologies, Inc. | 1.9 mi |
| San Jose Colocation Center | 2.9 mi |
| Data center, 150 South 1st Street, San Jose | 3.1 mi |
Data centers mapped on OpenStreetMap within 25 miles. A data center draws from the regional grid, so being near this plant doesn't mean it buys this plant's power. U.S. data center map