SV Colo data center, Santa Clara

SV Colo data center, Santa Clara is a data center in Santa Clara, Santa Clara County, California. It is mapped as 1 building covering about 1.3 acres (57,000 sq ft). Its power comes off the California grid (California ISO), which runs on 43% natural gas, 20% solar and 14% hydroelectric.

OperatorSV Coloas mapped
Roof area1.3 ac1 building
Grid CO₂426 lbper MWh, CAMX region
Nearest plant0.8 miSC 1 Data Center, Phase 2

Location

This data centerOther data centersPower plants (colored by fuel)

AddressRichard Avenue, Santa Clara CA 95052
CountySanta Clara County, California
Coordinates37.36422, -121.95882
Websitewww.svcolo.com/index.html
On OpenStreetMapway/224174031

What powers SV Colo data center, Santa Clara

A data center doesn't run on the nearest power plant. It draws from the regional grid, where electricity from every plant on the system mixes. This site is in EPA's California grid region, and the county's largest utility is on the California ISO grid. In 2023, the region's electricity was 43% natural gas, 20% solar, 14% hydroelectric and 8% nuclear.

Each megawatt-hour carried about 426 lb of CO₂, 44% cleaner than the U.S. grid as a whole (765 lb).

Natural Gas 43%Solar 20%Hydroelectric 14%Nuclear 8%Wind 7%Geothermal 4%Biomass 2%Coal 2%

Share of electricity generated in EPA's California grid region (CAMX) in 2023, from eGRID. 222 TWh from 1,674 plants.

Utilities that serve Santa Clara County

UtilityTypeGridBusiness rateIndustrial rate
Pacific Gas & Electric Co.Investor OwnedCalifornia ISO39.5¢33.1¢
City of Santa Clara - (CA)MunicipalCalifornia ISO22.1¢15.1¢
City of Palo Alto - (CA)MunicipalCalifornia ISO17.0¢19.0¢
WAPA-- Western Area Power AdministrationFederalWestern Area Power Administration - Desert Southwest Region4.6¢2.9¢

Utilities that report serving Santa Clara County to the EIA (Form 861, 2024), largest first. Rates are each utility's average revenue per kilowatt-hour from commercial and from industrial customers across the state in 2024; a large data center usually negotiates its own contract.

Nearest power plants

PlantFuelCapacityDistance
SC 1 Data Center, Phase 2Oil99.6 MW0.8 mi
CoreSite Real Estate SV9, L.P.Oil31.5 MW0.9 mi
Donald Von Raesfeld Power PlantNatural Gas154 MW1.0 mi
EQX011 Duane Fuel CellNatural Gas5.2 MW1.0 mi
CoreSite Real Estate 2901 Coronado, L.P.Oil10.0 MW1.0 mi
CoreSite Real Estate 2972 Stender, L.P.Oil12.0 MW1.1 mi
CoreSite Real Estate 3032 Coronado, L.P.Oil39.0 MW1.1 mi
CoreSite Real Estate 3045 Stender, LPOil27.0 MW1.1 mi
SCU000 El Camino Real Fuel CellNatural Gas1.5 MW1.4 mi
Intel Santa ClaraNatural Gas1.1 MW1.4 mi

The largest power plant within 50 miles is Dynegy Moss Landing Power Plant Hybrid, a 1,848 MW natural gas plant 40 miles away.

Operating plants from EIA Form 860, by straight-line distance. Being close doesn't mean a plant supplies the site.

Other data centers within 5 miles

Data centerOperatorRoof areaDistance
Cologix Santa Clara SV1 Data CenterCologix1.8 ac0.2 mi
STACK SVY02Stack Infrastructure3.1 ac0.3 mi
NTT Silicon Valley SV1 Data CenterNTT0.9 ac0.4 mi
Vantage Santa Clara CA2Vantage Data Centers3.0 ac0.7 mi
Microsoft data center, Santa ClaraMicrosoft3.8 ac0.7 mi
Digital Realty Silicon Valley SJC29Digital Realty0.9 ac0.8 mi
Csquare SFO1Csquare4.0 ac0.8 mi
Digital Realty Silicon Valley SJC16Digital Realty1.0 ac0.8 mi
Digital Realty Silicon Valley SJC37Digital Realty3.6 ac0.8 mi
Prime SANTA CLARA DATA CENTERPrime0.6 ac0.8 mi
Digital Realty Silicon Valley SJC15Digital Realty0.6 ac0.8 mi
Silicon Valley SJC31Digital Realty3.3 ac0.8 mi
Prime Santa ClaraPrime0.7 ac0.8 mi
Csquare SFO4Csquare1.4 ac0.8 mi
Digital Realty Silicon Valley SJC10Digital Realty1.3 ac0.9 mi

And 42 more within 5 miles.

More

Data centers in California · Data centers in Santa Clara County · U.S. data center map

About this data

The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.

The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.

How the power-plant data is built · Data centers near me