CoreSite Real Estate SV9, L.P. is a oil power plant in California with a nameplate capacity of 31.5 MW.
The 31.5 MW is nameplate capacity: the most this plant's generators are rated to produce, not what it actually generates. EPA eGRID reports no positive net generation for it this year.
How it works
Why the numbers look like this: engines start in minutes and come in small blocks, so they show up at landfills, on islands and as backup or peaking units — places that need power in small, fast pieces.
This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.
| Address | 2915 Stender Way |
|---|---|
| City | Santa Clara |
| County | Santa Clara County |
| State | California |
| ZIP | 95054 |
| Coordinates | 37.37490, -121.96916 |
| Operator | CoreSite Real Estate SV9, L.P. |
| ID | Technology | Fuel | Nameplate capacity | Status | Online |
|---|---|---|---|---|---|
| G-1 | Petroleum Liquids | Distillate Oil | 3.5 MW | Standby | 2024 |
| G-2 | Petroleum Liquids | Distillate Oil | 3.5 MW | Standby | 2024 |
| G-3 | Petroleum Liquids | Distillate Oil | 3.5 MW | Standby | 2024 |
| G-4 | Petroleum Liquids | Distillate Oil | 3.5 MW | Standby | 2024 |
| G-5 | Petroleum Liquids | Distillate Oil | 3.5 MW | Standby | 2024 |
| G-6 | Petroleum Liquids | Distillate Oil | 3.5 MW | Standby | 2025 |
| G-7 | Petroleum Liquids | Distillate Oil | 3.5 MW | Standby | 2025 |
| G-8 | Petroleum Liquids | Distillate Oil | 3.5 MW | Standby | 2025 |
| G-9 | Petroleum Liquids | Distillate Oil | 3.5 MW | Standby | 2025 |
| NERC Region | WECC |
|---|---|
| Balancing Authority | California Independent System Operator |
Oil-fired plants typically run only during peak demand or grid emergencies because oil is expensive compared to gas and coal. Per megawatt-hour, they emit nearly as much CO₂ as coal.
| Data center | Distance |
|---|---|
| CoreSite SV9 | 0.0 mi |
| CoreSite SV5 | 0.1 mi |
| CoreSite SV4 | 0.1 mi |
| CoreSite SV3 | 0.1 mi |
| CoreSite SV6 | 0.2 mi |
| CoreSite SV8 | 0.2 mi |
| CoreSite SV7 | 0.2 mi |
| Vantage data center, Santa Clara | 0.2 mi |
Data centers mapped on OpenStreetMap within 25 miles. A data center draws from the regional grid, so being near this plant doesn't mean it buys this plant's power. U.S. data center map