Cologix Santa Clara SV1 Data Center is a data center in Santa Clara, Santa Clara County, California. It is mapped as 1 building covering about 1.8 acres (80,000 sq ft). Its power comes off the California grid (California ISO), which runs on 43% natural gas, 20% solar and 14% hydroelectric.
This data centerOther data centersPower plants (colored by fuel)
| Address | 2050 Martin Avenue, Santa Clara CA 95052 |
|---|---|
| County | Santa Clara County, California |
| Coordinates | 37.36537, -121.96166 |
| On OpenStreetMap | way/40608200 |
A data center doesn't run on the nearest power plant. It draws from the regional grid, where electricity from every plant on the system mixes. This site is in EPA's California grid region, and the county's largest utility is on the California ISO grid. In 2023, the region's electricity was 43% natural gas, 20% solar, 14% hydroelectric and 8% nuclear.
Each megawatt-hour carried about 426 lb of CO₂, 44% cleaner than the U.S. grid as a whole (765 lb).
Share of electricity generated in EPA's California grid region (CAMX) in 2023, from eGRID. 222 TWh from 1,674 plants.
| Utility | Business rate | Industrial rate |
|---|---|---|
| Pacific Gas & Electric Co. | 39.5¢ | 33.1¢ |
| City of Santa Clara - (CA) | 22.1¢ | 15.1¢ |
| City of Palo Alto - (CA) | 17.0¢ | 19.0¢ |
| WAPA-- Western Area Power Administration | 4.6¢ | 2.9¢ |
Utilities that report serving Santa Clara County to the EIA (Form 861, 2024), largest first. Rates are each utility's average revenue per kilowatt-hour from commercial and from industrial customers across the state in 2024; a large data center usually negotiates its own contract.
| Plant | Fuel | Capacity | Distance |
|---|---|---|---|
| CoreSite Real Estate SV9, L.P. | Oil | 31.5 MW | 0.8 mi |
| CoreSite Real Estate 2901 Coronado, L.P. | Oil | 10.0 MW | 0.9 mi |
| CoreSite Real Estate 2972 Stender, L.P. | Oil | 12.0 MW | 0.9 mi |
| EQX011 Duane Fuel Cell | Natural Gas | 5.2 MW | 1.0 mi |
| CoreSite Real Estate 3032 Coronado, L.P. | Oil | 39.0 MW | 1.0 mi |
| Donald Von Raesfeld Power Plant | Natural Gas | 154 MW | 1.0 mi |
| CoreSite Real Estate 3045 Stender, LP | Oil | 27.0 MW | 1.0 mi |
| SC 1 Data Center, Phase 2 | Oil | 99.6 MW | 1.0 mi |
| Intel Santa Clara | Natural Gas | 1.1 MW | 1.3 mi |
| Mission College Blvd. Fuel Cell | Natural Gas | 5.0 MW | 1.4 mi |
The largest power plant within 50 miles is Dynegy Moss Landing Power Plant Hybrid, a 1,848 MW natural gas plant 40 miles away.
Operating plants from EIA Form 860, by straight-line distance. Being close doesn't mean a plant supplies the site.
| Data center | Roof area | Distance |
|---|---|---|
| SV Colo data center, Santa Clara | 1.3 ac | 0.2 mi |
| NTT Silicon Valley SV1 Data Center | 0.9 ac | 0.4 mi |
| STACK SVY02 | 3.1 ac | 0.5 mi |
| Csquare SFO1 | 4.0 ac | 0.6 mi |
| Digital Realty Silicon Valley SJC29 | 0.9 ac | 0.7 mi |
| Digital Realty Silicon Valley SJC16 | 1.0 ac | 0.7 mi |
| Prime SANTA CLARA DATA CENTER | 0.6 ac | 0.8 mi |
| Digital Realty Silicon Valley SJC15 | 0.6 ac | 0.8 mi |
| Vantage data center, Santa Clara | 3.8 ac | 0.8 mi |
| Csquare SFO4 | 1.4 ac | 0.8 mi |
| Digital Realty Silicon Valley SJC34 | 5.8 ac | 0.8 mi |
| Prime Santa Clara | 0.7 ac | 0.8 mi |
| CoreSite SV9 | 1.4 ac | 0.8 mi |
| Vantage Santa Clara CA2 | 3.0 ac | 0.8 mi |
| CoreSite SV5 | 1.2 ac | 0.8 mi |
And 42 more within 5 miles.
Data centers in California · Data centers in Santa Clara County · All Cologix data centers · U.S. data center map
The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.
The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.