CoreSite Secaucus Campus

CoreSite Secaucus Campus is a data center in Secaucus, Hudson County, New Jersey. It is mapped as 1 building covering about 3.4 acres (150,000 sq ft). Its power comes off the Mid-Atlantic grid (PJM Interconnection), which runs on 54% natural gas, 36% nuclear and 5% coal.

OperatorCoreSiteas mapped
Roof area3.4 ac1 building
Grid CO₂594 lbper MWh, RFCE region
Nearest plant0.4 miHartz Way

Location

This data centerOther data centersPower plants (colored by fuel)

CountyHudson County, New Jersey
Coordinates40.78417, -74.06586
Websitecoresite.com/data-center/ny2-secaucus-nj
On OpenStreetMapway/714139868, way/451491797

What powers CoreSite Secaucus Campus

A data center doesn't run on the nearest power plant. It draws from the regional grid, where electricity from every plant on the system mixes. This site is in EPA's Mid-Atlantic grid region, and the county's largest utility is on the PJM Interconnection grid. In 2023, the region's electricity was 54% natural gas, 36% nuclear and 5% coal.

Each megawatt-hour carried about 594 lb of CO₂, 22% cleaner than the U.S. grid as a whole (765 lb).

Natural Gas 54%Nuclear 36%Coal 5%

Share of electricity generated in EPA's Mid-Atlantic grid region (RFCE) in 2023, from eGRID. 286 TWh from 815 plants.

Utilities that serve Hudson County

UtilityTypeGridBusiness rateIndustrial rate
Public Service Elec & Gas CoInvestor OwnedPJM Interconnection14.7¢8.4¢

Utilities that report serving Hudson County to the EIA (Form 861, 2024), largest first. Rates are each utility's average revenue per kilowatt-hour from commercial and from industrial customers across the state in 2024; a large data center usually negotiates its own contract.

Nearest power plants

PlantFuelCapacityDistance
Hartz WaySolar1.0 MW0.4 mi
46 Meadowlands ParkwaySolar1.5 MW0.5 mi
EQX003 Secaucus Rd Fuel CellNatural Gas2.0 MW0.5 mi
EQX002 Secaucus Rd Fuel CellNatural Gas1.5 MW0.7 mi
EQX012 Harz Fuel CellNatural Gas2.5 MW0.7 mi
Goya Foods, Inc- Secaucus SolarSolar1.6 MW1.0 mi
77 Metro WaySolar1.0 MW1.0 mi
5601 Westside CDGSolar1.5 MW1.3 mi
Goya Foods, Inc- Jersey City SolarSolar2.5 MW1.7 mi
Westside AvenueSolar1.0 MW3.1 mi

The largest power plant within 50 miles is Ravenswood, a 2,096 MW natural gas plant 6 miles away.

Operating plants from EIA Form 860, by straight-line distance. Being close doesn't mean a plant supplies the site.

Other data centers within 5 miles

Data centerOperatorRoof areaDistance
CoreSite NY3CoreSite1.7 ac0.1 mi
Centersquare NYC3 Data CenterCentersquare3.3 ac0.2 mi
Evocative SecaucusEvocative2.3 ac0.3 mi
H5 SecaucusH5—0.5 mi
Equinix New York Secaucus NY5Equinix4.8 ac0.5 mi
Equinix New York Secaucus NY4Equinix7.2 ac0.6 mi
Equinix Secaucus NY6Equinix1.6 ac0.6 mi
Equinix NY3Equinix6.3 ac0.7 mi
Equinix New York Secaucus NY2Equinix9.2 ac0.7 mi
Equinix NY7 Data CenterEquinix1.6 ac2.0 mi
Digital Realty New Jersey EWR10Digital Realty2.9 ac2.6 mi
Cyxtera (Digital Realty Trust) Citibank Data CenterCyxtera1.3 ac2.7 mi
BT Radianz: 492 River Roadbt2.5 ac4.4 mi
Digital Realty New Jersey EWR21Digital Realty1.6 ac4.4 mi
Digital Realty New Jersey EWR20Digital Realty0.7 ac4.5 mi

More

Data centers in New Jersey · Data centers in Hudson County · All CoreSite data centers · U.S. data center map

About this data

The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.

The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.

How the power-plant data is built · Data centers near me