Electric generating plantEIA plant no. 60500

Westside Avenue

Type
Solar Photovoltaic
Nameplate capacity
1.0 MW
Units
1
In service since
2011
Operator
Hartz Solar, LLC
Location
North Bergen, Hudson County, New Jersey
Rated 405th largest in New Jersey · 13806th of 14,761 in the U.S. · by nameplate

Westside Avenue is a solar power plant in New Jersey with a nameplate capacity of 1.0 MW. It generates roughly 1.1k MWh per year — enough to power about 103 average U.S. homes.

Its capacity factor of 12% reflects intermittent or peaking operation.

On paper vs. what it actually made

each square = 1 hour at full nameplate

Run flat out every hour of the year, Westside Avenue could make 8.8k MWh. In 2023 it made 1.1k MWh — the same as running at full power 12 hours in every 100.

Nameplate, full year8.8k MWh1.0 MW × 8,760 hours
Actually generated1.1k MWhEPA eGRID, 2023 · ≈103 homes

Peaking or variableCapacity factor 12%. It runs only part of the time — when demand is high, or when the wind or sun allows.

How it works

A solar farm

DCAC1panels turn light into DC current2inverters make AC3to the grid
  1. Silicon cells in each panel turn sunlight directly into direct current (DC). Nothing moves; nothing burns.
  2. Inverters convert DC into the alternating current (AC) the grid uses.
  3. A substation raises the voltage and sends it onto transmission lines.

Why the numbers look like this: panels make nothing at night and less in winter, so even a well-placed U.S. solar farm averages around a quarter of its nameplate over a year. Watch the monthly bars: they swell in summer and shrink in December.

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

Natural GasOilSolar

Location

Address8501 Westside Avenue
CityNorth Bergen
CountyHudson County
StateNew Jersey
ZIP07047
Coordinates40.81409, -74.02133
OperatorHartz Solar, LLC

Generators (1)

IDTechnologyFuelNameplate capacityStatusOnline
1Solar PhotovoltaicSolar1.0 MWOperating2011

Grid context

NERC RegionRFC
Balancing AuthorityPJM Interconnection, LLC

About Solar plants

Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.

Other plants in Hudson County

View all plants in Hudson County →

Data centers near Westside Avenue

Data centerOperatorDistance
Equinix NY7 Data CenterEquinix1.3 mi
CoreSite NY3CoreSite3.0 mi
CoreSite Secaucus CampusCoreSite3.1 mi

Data centers mapped on OpenStreetMap within 25 miles. A data center draws from the regional grid, so being near this plant doesn't mean it buys this plant's power. U.S. data center map

Explore more