77 Metro Way is a solar power plant in New Jersey with a nameplate capacity of 1.0 MW. It generates roughly 1.5k MWh per year — enough to power about 145 average U.S. homes.
Its capacity factor of 17% reflects intermittent or peaking operation.
Run flat out every hour of the year, 77 Metro Way could make 8.8k MWh. In 2023 it made 1.5k MWh — the same as running at full power 17 hours in every 100.
Peaking or variableCapacity factor 17%. It runs only part of the time — when demand is high, or when the wind or sun allows.
How it works
Why the numbers look like this: panels make nothing at night and less in winter, so even a well-placed U.S. solar farm averages around a quarter of its nameplate over a year. Watch the monthly bars: they swell in summer and shrink in December.
This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.
| Address | 77 Metro Way |
|---|---|
| City | Secaucus |
| County | Hudson County |
| State | New Jersey |
| ZIP | 07094 |
| Coordinates | 40.77052, -74.07224 |
| Operator | Hartz Solar, LLC |
| ID | Technology | Fuel | Nameplate capacity | Status | Online |
|---|---|---|---|---|---|
| 1 | Solar Photovoltaic | Solar | 1.0 MW | Operating | 2018 |
| NERC Region | RFC |
|---|---|
| Balancing Authority | PJM Interconnection, LLC |
Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.
| Data center | Distance |
|---|---|
| Equinix NY3 | 0.3 mi |
| Equinix New York Secaucus NY4 | 0.5 mi |
| Equinix Secaucus NY6 | 0.5 mi |
| Equinix New York Secaucus NY2 | 0.5 mi |
| Equinix New York Secaucus NY5 | 0.6 mi |
| CoreSite Secaucus Campus | 1.0 mi |
| H5 Secaucus | 1.0 mi |
| CoreSite NY3 | 1.1 mi |
Data centers mapped on OpenStreetMap within 25 miles. A data center draws from the regional grid, so being near this plant doesn't mean it buys this plant's power. U.S. data center map