Data Centers in Hudson County, NJ

13 data centers are mapped in Hudson County, New Jersey: 14 buildings covering about 45.6 acres (1,988,000 sq ft) of roof. Operators include Equinix, CoreSite, Centersquare, Cyxtera. The county is in EPA's Mid-Atlantic grid region, whose electricity is 54% natural gas, 36% nuclear and 5% coal, at 594 lb of CO₂ per megawatt-hour.

Sites13mapped data centers
Buildings14mapped footprints
Roof area46 acbuilding footprints
GridPJM Interconnectionlargest utility's grid

Map

Data centerUnder constructionPower plant (colored by fuel)

Data centers in Hudson County

Data centerOperatorCityRoof area
Equinix New York Secaucus NY2EquinixSecaucus9.2 ac
Equinix New York Secaucus NY4EquinixSecaucus7.2 ac
Equinix NY3EquinixSecaucus6.3 ac
Equinix New York Secaucus NY5EquinixSecaucus4.8 ac
CoreSite Secaucus CampusCoreSiteSecaucus3.4 ac
Centersquare NYC3 Data CenterCentersquareSecaucus3.3 ac
Digital Realty New Jersey EWR10Digital RealtyWeehawken2.9 ac
Evocative SecaucusEvocativeSecaucus2.3 ac
CoreSite NY3CoreSiteSecaucus1.7 ac
Equinix Secaucus NY6EquinixSecaucus1.6 ac
Equinix NY7 Data CenterEquinixNorth Bergen1.6 ac
Cyxtera (Digital Realty Trust) Citibank Data CenterCyxteraWeehawken1.3 ac
H5 SecaucusH5Secaucus—

What the grid here generates

Data centers in Hudson County draw from the regional grid. In 2023, electricity in EPA's Mid-Atlantic region was 54% natural gas, 36% nuclear and 5% coal, at 594 lb of CO₂ per megawatt-hour, 22% cleaner than the U.S. grid as a whole (765 lb).

Natural Gas 54%Nuclear 36%Coal 5%

Share of electricity generated in EPA's Mid-Atlantic grid region (RFCE) in 2023, from eGRID. 286 TWh from 815 plants.

Utilities that serve Hudson County

UtilityTypeGridBusiness rateIndustrial rate
Public Service Elec & Gas CoInvestor OwnedPJM Interconnection14.7¢8.4¢

Utilities that report serving Hudson County to the EIA (Form 861, 2024), largest first. Rates are each utility's average revenue per kilowatt-hour from commercial and from industrial customers across the state in 2024; a large data center usually negotiates its own contract.

Power plants in Hudson County

PlantFuelCapacity
Bayonne Energy CenterNatural Gas644 MW
Kearny Generating StationNatural Gas605 MW
Ports Jersey City SolarSolar3.0 MW
River Terminal Development SolarSolar2.9 MW
NJMC LandfillSolar2.5 MW
Goya Foods, Inc- Jersey City SolarSolar2.5 MW
EQX012 Harz Fuel CellNatural Gas2.5 MW
Bayonne Solar 2 LLC (CSG)Solar2.1 MW
EQX003 Secaucus Rd Fuel CellNatural Gas2.0 MW
North Bergen SolarSolar1.6 MW
Goya Foods, Inc- Secaucus SolarSolar1.6 MW
WEA Texas BayonneSolar1.5 MW
Bayonne MUA- Leitner-Poma Wind TurbineWind1.5 MW
46 Meadowlands ParkwaySolar1.5 MW
EQX002 Secaucus Rd Fuel CellNatural Gas1.5 MW

All power plants in Hudson County →

About this data

The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.

The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.

How the power-plant data is built · Data centers near me