13 data centers are mapped in Hudson County, New Jersey: 14 buildings covering about 45.6 acres (1,988,000 sq ft) of roof. Operators include Equinix, CoreSite, Centersquare, Cyxtera. The county is in EPA's Mid-Atlantic grid region, whose electricity is 54% natural gas, 36% nuclear and 5% coal, at 594 lb of CO₂ per megawatt-hour.
Data centerUnder constructionPower plant (colored by fuel)
| Data center | City | Roof area |
|---|---|---|
| Equinix New York Secaucus NY2 | Secaucus | 9.2 ac |
| Equinix New York Secaucus NY4 | Secaucus | 7.2 ac |
| Equinix NY3 | Secaucus | 6.3 ac |
| Equinix New York Secaucus NY5 | Secaucus | 4.8 ac |
| CoreSite Secaucus Campus | Secaucus | 3.4 ac |
| Centersquare NYC3 Data Center | Secaucus | 3.3 ac |
| Digital Realty New Jersey EWR10 | Weehawken | 2.9 ac |
| Evocative Secaucus | Secaucus | 2.3 ac |
| CoreSite NY3 | Secaucus | 1.7 ac |
| Equinix Secaucus NY6 | Secaucus | 1.6 ac |
| Equinix NY7 Data Center | North Bergen | 1.6 ac |
| Cyxtera (Digital Realty Trust) Citibank Data Center | Weehawken | 1.3 ac |
| H5 Secaucus | Secaucus | — |
Data centers in Hudson County draw from the regional grid. In 2023, electricity in EPA's Mid-Atlantic region was 54% natural gas, 36% nuclear and 5% coal, at 594 lb of CO₂ per megawatt-hour, 22% cleaner than the U.S. grid as a whole (765 lb).
Share of electricity generated in EPA's Mid-Atlantic grid region (RFCE) in 2023, from eGRID. 286 TWh from 815 plants.
| Utility | Business rate | Industrial rate |
|---|---|---|
| Public Service Elec & Gas Co | 14.7¢ | 8.4¢ |
Utilities that report serving Hudson County to the EIA (Form 861, 2024), largest first. Rates are each utility's average revenue per kilowatt-hour from commercial and from industrial customers across the state in 2024; a large data center usually negotiates its own contract.
| Plant | Fuel | Capacity |
|---|---|---|
| Bayonne Energy Center | Natural Gas | 644 MW |
| Kearny Generating Station | Natural Gas | 605 MW |
| Ports Jersey City Solar | Solar | 3.0 MW |
| River Terminal Development Solar | Solar | 2.9 MW |
| NJMC Landfill | Solar | 2.5 MW |
| Goya Foods, Inc- Jersey City Solar | Solar | 2.5 MW |
| EQX012 Harz Fuel Cell | Natural Gas | 2.5 MW |
| Bayonne Solar 2 LLC (CSG) | Solar | 2.1 MW |
| EQX003 Secaucus Rd Fuel Cell | Natural Gas | 2.0 MW |
| North Bergen Solar | Solar | 1.6 MW |
| Goya Foods, Inc- Secaucus Solar | Solar | 1.6 MW |
| WEA Texas Bayonne | Solar | 1.5 MW |
| Bayonne MUA- Leitner-Poma Wind Turbine | Wind | 1.5 MW |
| 46 Meadowlands Parkway | Solar | 1.5 MW |
| EQX002 Secaucus Rd Fuel Cell | Natural Gas | 1.5 MW |
The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.
The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.