54 data centers mapped in New Jersey: 57 buildings covering about 159 acres of roof. The most are in Hudson County (13). Most sit in EPA's Mid-Atlantic grid region, whose electricity is 54% natural gas, 36% nuclear and 5% coal, at 594 lb of CO₂ per megawatt-hour, 22% cleaner than the U.S. grid as a whole (765 lb).
Sites54mapped data centers
Buildings57mapped footprints
Roof area159 acbuilding footprints
Counties11with a data center
Map of data centers in New Jersey
Data centerUnder construction
What powers New Jersey's data centers
A data center draws from its regional grid, not from one plant. These are the grid regions New Jersey's data centers sit in, and what those regions generate:
Mid-Atlantic · 53 sites
594 lb CO₂ per MWh, 22% cleaner than the U.S. grid as a whole (765 lb).
Natural Gas 54%Nuclear 36%Coal 5%
Share of electricity generated in EPA's Mid-Atlantic grid region (RFCE) in 2023, from eGRID. 286 TWh from 815 plants.
Upstate New York · 1 site
241 lb CO₂ per MWh, 69% cleaner than the U.S. grid as a whole (765 lb).
Hydroelectric 33%Nuclear 32%Natural Gas 25%Wind 6%Solar 2%
Share of electricity generated in EPA's Upstate New York grid region (NYUP) in 2023, from eGRID. 85.7 TWh from 687 plants.
The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.
The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.