9 Verizon data centers are mapped in the U.S. on OpenStreetMap, in 6 states: 10 buildings covering about 10.2 acres (445,000 sq ft) of roof. Weighted by building size, the grids they sit on average 775 lb of CO₂ per megawatt-hour, close to the U.S. grid as a whole (765 lb).
Data centerUnder construction
| Grid region | Sites | CO₂ lb/MWh |
|---|---|---|
| Upper Midwest | 3 | 920 |
| Mid-Atlantic | 2 | 594 |
| Southwest (Arizona/New Mexico) | 2 | 703 |
| Northwest | 1 | 631 |
| Rocky Mountains | 1 | 1,036 |
| Data center | Place | Roof area |
|---|---|---|
| Verizon data center, Englewood | Englewood, Colorado | 0.2 ac |
| Verizon - Bloomington Network | Bloomington, Minnesota | 1.6 ac |
| Verizon data center, 1200 North Washington Avenue, Minneapolis | Minneapolis, Minnesota | 1.2 ac |
| Verizon data center, Omaha | Omaha, Nebraska | 2.3 ac |
| Verizon Freehold Data Center | Freehold, New Jersey | 2.2 ac |
| Verizon Branchburg NEC Datacenter | Somerville, New Jersey | 1.3 ac |
| Verizon data center, Las Vegas | Las Vegas, Nevada | 0.6 ac |
| Verizon North Las Vegas | North Las Vegas, Nevada | 0.6 ac |
| Verizon data center, Sandy City | Sandy City, Utah | 0.4 ac |
The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.
The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.