11 data centers are mapped in Somerset County, New Jersey: 12 buildings covering about 29.4 acres (1,282,000 sq ft) of roof. Operators include CyrusOne, Digital Realty, PSE&G, Verizon. The county is in EPA's Mid-Atlantic grid region, whose electricity is 54% natural gas, 36% nuclear and 5% coal, at 594 lb of CO₂ per megawatt-hour.
Data centerUnder constructionPower plant (colored by fuel)
| Data center | City | Roof area |
|---|---|---|
| NYM1 | Somerset | 7.0 ac |
| Goldman Sachs | Bridgewater Township | 6.3 ac |
| BNY Mellon Somerset | Zarephath | 5.6 ac |
| Data center, 665 Howard Avenue, Somerset | Somerset | 4.7 ac |
| PSE&G Delivery Emergency Response Center | Middlesex | 1.9 ac |
| Rackspace Belmont NYC2 | South Bound Brook | 1.3 ac |
| Verizon Branchburg NEC Datacenter | Somerville | 1.3 ac |
| 365 Bridgewater NJ | Bridgewater | 0.6 ac |
| Rackspace Somerset NYC1 | South Bound Brook | 0.4 ac |
| Vital Records | Flagtown | 0.2 ac |
| Data center, Zarephath | Zarephath | — |
Data centers in Somerset County draw from the regional grid. In 2023, electricity in EPA's Mid-Atlantic region was 54% natural gas, 36% nuclear and 5% coal, at 594 lb of CO₂ per megawatt-hour, 22% cleaner than the U.S. grid as a whole (765 lb).
Share of electricity generated in EPA's Mid-Atlantic grid region (RFCE) in 2023, from eGRID. 286 TWh from 815 plants.
| Utility | Business rate | Industrial rate |
|---|---|---|
| Public Service Elec & Gas Co | 14.7¢ | 8.4¢ |
| Jersey Central Power & Lt Co | 15.0¢ | 13.9¢ |
Utilities that report serving Somerset County to the EIA (Form 861, 2024), largest first. Rates are each utility's average revenue per kilowatt-hour from commercial and from industrial customers across the state in 2024; a large data center usually negotiates its own contract.
| Plant | Fuel | Capacity |
|---|---|---|
| Imclone Solar Electric Facility | Solar | 8.0 MW |
| Pfizer Peapack Solar | Solar | 6.2 MW |
| CIP II/AR Bridgewater Holdings - NJCOE | Natural Gas | 5.0 MW |
| Canal Road Solar | Solar | 4.0 MW |
| Franklin Solar 3 LLC | Solar | 4.0 MW |
| Franklin Solar 2 LLC Community Solar | Solar | 3.8 MW |
| LabCorp Engine | Natural Gas | 3.2 MW |
| Franklin Solar 1 LLC Community Solar | Solar | 3.0 MW |
| Bernards Solar | Solar | 2.9 MW |
| Rotor Clip | Solar | 2.8 MW |
| IIV000 Mt Bethel Fuel Cell | Natural Gas | 2.6 MW |
| Silvi Gibraltar Rock | Solar | 2.5 MW |
| 10 Finderne Avenue Solar, LLC | Solar | 2.3 MW |
| SCS Randolph 012175 Somerset, LLC | Solar | 2.3 MW |
| Raritan ITS | Solar | 2.0 MW |
The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.
The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.