Barclays Datacenter

Barclays Datacenter is a data center in Piscataway, Middlesex County, New Jersey. It is mapped as 1 building covering about 8.0 acres (350,000 sq ft). Its power comes off the Mid-Atlantic grid (PJM Interconnection), which runs on 54% natural gas, 36% nuclear and 5% coal.

OperatorBarclaysas mapped
Roof area8.0 ac1 building
Grid CO₂594 lbper MWh, RFCE region
Nearest plant0.7 miL'Oreal Piscataway

Location

This data centerOther data centersPower plants (colored by fuel)

CountyMiddlesex County, New Jersey
Coordinates40.54714, -74.45916
On OpenStreetMapway/204460835

What powers Barclays Datacenter

A data center doesn't run on the nearest power plant. It draws from the regional grid, where electricity from every plant on the system mixes. This site is in EPA's Mid-Atlantic grid region, and the county's largest utility is on the PJM Interconnection grid. In 2023, the region's electricity was 54% natural gas, 36% nuclear and 5% coal.

Each megawatt-hour carried about 594 lb of CO₂, 22% cleaner than the U.S. grid as a whole (765 lb).

Natural Gas 54%Nuclear 36%Coal 5%

Share of electricity generated in EPA's Mid-Atlantic grid region (RFCE) in 2023, from eGRID. 286 TWh from 815 plants.

Utilities that serve Middlesex County

UtilityTypeGridBusiness rateIndustrial rate
Public Service Elec & Gas CoInvestor OwnedPJM Interconnection14.7¢8.4¢
Jersey Central Power & Lt CoInvestor OwnedPJM Interconnection15.0¢13.9¢

Utilities that report serving Middlesex County to the EIA (Form 861, 2024), largest first. Rates are each utility's average revenue per kilowatt-hour from commercial and from industrial customers across the state in 2024; a large data center usually negotiates its own contract.

Nearest power plants

PlantFuelCapacityDistance
L'Oreal PiscatawaySolar1.8 MW0.7 mi
Solops 371 Hoes LLCSolar1.3 MW0.8 mi
CascadesSolar2.0 MW0.8 mi
Chanel Piscataway RooftopSolar1.4 MW1.3 mi
Rutgers Busch Liv (Lot 55, 58, 58A, 58B)Solar1.3 MW1.6 mi
Livingston Solar CanopiesSolar6.6 MW1.7 mi
Middlesex Vo Tech Solar 1 LLCSolar1.5 MW1.8 mi
Rutgers Busch Livingston Lot B & CSolar1.5 MW1.9 mi
Livingston Solar FarmSolar1.2 MW2.2 mi
Prologis - SLCNJ001 - Community SolarSolar3.2 MW2.4 mi

The largest power plant within 50 miles is Ravenswood, a 2,096 MW natural gas plant 31 miles away.

Operating plants from EIA Form 860, by straight-line distance. Being close doesn't mean a plant supplies the site.

Other data centers within 5 miles

Data centerOperatorRoof areaDistance
DataBank Piscataway EWR2DataBank1.2 ac0.2 mi
Open Data Centers PiscatawayOperator not recorded—0.3 mi
Digital Realty New York EWR12Digital Realty6.9 ac0.4 mi
Digital Realty New York EWR11Digital Realty3.6 ac0.5 mi
QTS Piscataway Data CenterQuality Technology Services7.8 ac1.5 mi
OptimumOperator not recorded1.5 ac1.7 mi
Equinix data center, South Bound BrookEquinix1.4 ac1.9 mi
Chirisa Technology Parks - PiscatawayChirisa Technology Parks—2.0 mi
PSE&G Delivery Emergency Response CenterPSE&G1.9 ac3.9 mi
Rackspace Belmont NYC2Operator not recorded1.3 ac4.1 mi
Rackspace Somerset NYC1Operator not recorded0.4 ac4.1 mi
Data center, 665 Howard Avenue, SomersetOperator not recorded4.7 ac4.4 mi
NYM1CyrusOne7.0 ac4.6 mi
Data center, ZarephathOperator not recorded—4.9 mi

More

Data centers in New Jersey · Data centers in Middlesex County · U.S. data center map

About this data

The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.

The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.

How the power-plant data is built · Data centers near me