Electric generating plantEIA plant no. 64380

Cascades

Type
Solar Photovoltaic
Nameplate capacity
2.0 MW
Units
1
In service since
2021
Operator
Greenbacker Renewable Energy Corporation
Location
Piscataway Township, Middlesex County, New Jersey
Rated 271st largest in New Jersey · 11103rd of 14,761 in the U.S. · by nameplate

Cascades is a solar power plant in New Jersey with a nameplate capacity of 2.0 MW. It generates roughly 2.9k MWh per year — enough to power about 278 average U.S. homes.

Its capacity factor of 17% reflects intermittent or peaking operation.

On paper vs. what it actually made

each square = 1 hour at full nameplate

Run flat out every hour of the year, Cascades could make 17.5k MWh. In 2023 it made 2.9k MWh — the same as running at full power 17 hours in every 100.

Nameplate, full year17.5k MWh2.0 MW × 8,760 hours
Actually generated2.9k MWhEPA eGRID, 2023 · ≈278 homes

Peaking or variableCapacity factor 17%. It runs only part of the time — when demand is high, or when the wind or sun allows.

How it works

A solar farm

DCAC1panels turn light into DC current2inverters make AC3to the grid
  1. Silicon cells in each panel turn sunlight directly into direct current (DC). Nothing moves; nothing burns.
  2. Inverters convert DC into the alternating current (AC) the grid uses.
  3. A substation raises the voltage and sends it onto transmission lines.

Why the numbers look like this: panels make nothing at night and less in winter, so even a well-placed U.S. solar farm averages around a quarter of its nameplate over a year. Watch the monthly bars: they swell in summer and shrink in December.

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

Solar

Location

Address1 Turner Place
CityPiscataway Township
CountyMiddlesex County
StateNew Jersey
ZIP08854
Coordinates40.55879, -74.45646
OperatorGreenbacker Renewable Energy Corporation

Generators (1)

IDTechnologyFuelNameplate capacityStatusOnline
464Solar PhotovoltaicSolar2.0 MWOperating2021

Grid context

NERC RegionRFC
Balancing AuthorityPJM Interconnection, LLC

About Solar plants

Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.

Other plants in Middlesex County

View all plants in Middlesex County →

Data centers near Cascades

Data centerOperatorDistance
Digital Realty New York EWR11Digital Realty0.4 mi
Digital Realty New York EWR12Digital Realty0.4 mi
Open Data Centers PiscatawayNot recorded0.6 mi
DataBank Piscataway EWR2DataBank0.7 mi
Barclays DatacenterBarclays0.8 mi
QTS Piscataway Data CenterQuality Technology Services1.4 mi
OptimumNot recorded2.0 mi
Equinix data center, South Bound BrookEquinix2.3 mi

Data centers mapped on OpenStreetMap within 25 miles. A data center draws from the regional grid, so being near this plant doesn't mean it buys this plant's power. U.S. data center map

Explore more