NYM2

NYM2 is a data center run by CyrusOne in Totowa, Passaic County, New Jersey. It is mapped as 1 building covering about 2.7 acres (117,000 sq ft). Its power comes off the Mid-Atlantic grid (PJM Interconnection), which runs on 54% natural gas, 36% nuclear and 5% coal.

OperatorCyrusOneas mapped
Roof area2.7 ac1 building
Grid CO₂594 lbper MWh, RFCE region
Nearest plant0.4 miHarmon DC Totowa NJ

Location

This data centerOther data centersPower plants (colored by fuel)

Address50 Madison Road, Totowa NJ 07512
CountyPassaic County, New Jersey
Coordinates40.90741, -74.24232
On OpenStreetMapway/1556797631

What powers NYM2

A data center doesn't run on the nearest power plant. It draws from the regional grid, where electricity from every plant on the system mixes. This site is in EPA's Mid-Atlantic grid region, and the county's largest utility is on the PJM Interconnection grid. In 2023, the region's electricity was 54% natural gas, 36% nuclear and 5% coal.

Each megawatt-hour carried about 594 lb of CO₂, 22% cleaner than the U.S. grid as a whole (765 lb).

Natural Gas 54%Nuclear 36%Coal 5%

Share of electricity generated in EPA's Mid-Atlantic grid region (RFCE) in 2023, from eGRID. 286 TWh from 815 plants.

Utilities that serve Passaic County

UtilityTypeGridBusiness rateIndustrial rate
Public Service Elec & Gas CoInvestor OwnedPJM Interconnection14.7¢8.4¢
Jersey Central Power & Lt CoInvestor OwnedPJM Interconnection15.0¢13.9¢
Rockland Electric CoInvestor OwnedPJM Interconnection19.2¢12.4¢

Utilities that report serving Passaic County to the EIA (Form 861, 2024), largest first. Rates are each utility's average revenue per kilowatt-hour from commercial and from industrial customers across the state in 2024; a large data center usually negotiates its own contract.

Nearest power plants

PlantFuelCapacityDistance
Harmon DC Totowa NJSolar1.5 MW0.4 mi
Passaic Valley Water CommissionHydroelectric2.4 MW1.8 mi
Great Falls Hydro ProjectHydroelectric12.3 MW3.2 mi
St. Josephs WayneSolar2.5 MW3.4 mi
Montclair State University CogenNatural Gas11.8 MW3.8 mi
William Paterson UniversitySolar2.3 MW3.9 mi
St. Joseph's Regional Medical Center (NJ)Oil6.1 MW4.0 mi
CCG MarketingSolar1.5 MW4.6 mi
Caldwell Wastewater Treatment Plant HybrSolar1.7 MW6.0 mi
Citrine NJ - West PkwySolar2.3 MW6.1 mi

The largest power plant within 50 miles is Ravenswood, a 2,096 MW natural gas plant 19 miles away.

Operating plants from EIA Form 860, by straight-line distance. Being close doesn't mean a plant supplies the site.

Other data centers within 5 miles

Data centerOperatorRoof areaDistance
JPMorgan Chase data center, TotowaJPMorgan Chase4.4 ac0.6 mi

More

Data centers in New Jersey · Data centers in Passaic County · All CyrusOne data centers · U.S. data center map

About this data

The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.

The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.

How the power-plant data is built · Data centers near me