CCG Marketing is a solar power plant in New Jersey with a nameplate capacity of 1.5 MW. It generates roughly 1.7k MWh per year — enough to power about 165 average U.S. homes.
Its capacity factor of 13% reflects intermittent or peaking operation.
Run flat out every hour of the year, CCG Marketing could make 13.1k MWh. In 2023 it made 1.7k MWh — the same as running at full power 13 hours in every 100.
Peaking or variableCapacity factor 13%. It runs only part of the time — when demand is high, or when the wind or sun allows.
How it works
Why the numbers look like this: panels make nothing at night and less in winter, so even a well-placed U.S. solar farm averages around a quarter of its nameplate over a year. Watch the monthly bars: they swell in summer and shrink in December.
This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.
| Address | 14 Henderson Drive |
|---|---|
| City | West Caldwell |
| County | Essex County |
| State | New Jersey |
| ZIP | 07006 |
| Coordinates | 40.85934, -74.30296 |
| Operator | Powerflex |
| ID | Technology | Fuel | Nameplate capacity | Status | Online |
|---|---|---|---|---|---|
| CCGWC | Solar Photovoltaic | Solar | 1.5 MW | Operating | 2018 |
| Owner | Location | Share |
|---|---|---|
| CCG Marketing Solutions | West Caldwell, NJ | 10000.0% |
Ownership reported to EIA Form 860. Percentages reflect reported generator-level ownership share, averaged when a plant has multiple generators.
| NERC Region | RFC |
|---|---|
| Balancing Authority | PJM Interconnection, LLC |
Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.
| Data center | Distance |
|---|---|
| NYM2 | 4.6 mi |
| JPMorgan Chase data center, Totowa | 5.0 mi |
Data centers mapped on OpenStreetMap within 25 miles. A data center draws from the regional grid, so being near this plant doesn't mean it buys this plant's power. U.S. data center map