NYSE Data Center

NYSE Data Center is a data center in Ramsey, Bergen County, New Jersey. It is mapped as 1 building covering about 4.6 acres (200,000 sq ft). Its power comes off the Upstate New York grid (PJM Interconnection), which runs on 33% hydroelectric, 32% nuclear and 25% natural gas.

Operatornyseas mapped
Roof area4.6 ac1 building
Grid CO₂241 lbper MWh, NYUP region
Nearest plant0.1 miBergenmand Solar Partners…

Location

This data centerOther data centersPower plants (colored by fuel)

CountyBergen County, New Jersey
Coordinates41.07867, -74.15280
On OpenStreetMapway/472761713

What powers NYSE Data Center

A data center doesn't run on the nearest power plant. It draws from the regional grid, where electricity from every plant on the system mixes. This site is in EPA's Upstate New York grid region, and the county's largest utility is on the PJM Interconnection grid. In 2023, the region's electricity was 33% hydroelectric, 32% nuclear, 25% natural gas and 6% wind.

Each megawatt-hour carried about 241 lb of CO₂, 69% cleaner than the U.S. grid as a whole (765 lb).

Hydroelectric 33%Nuclear 32%Natural Gas 25%Wind 6%Solar 2%

Share of electricity generated in EPA's Upstate New York grid region (NYUP) in 2023, from eGRID. 85.7 TWh from 687 plants.

Utilities that serve Bergen County

UtilityTypeGridBusiness rateIndustrial rate
Public Service Elec & Gas CoInvestor OwnedPJM Interconnection14.7¢8.4¢
Rockland Electric CoInvestor OwnedPJM Interconnection19.2¢12.4¢

Utilities that report serving Bergen County to the EIA (Form 861, 2024), largest first. Rates are each utility's average revenue per kilowatt-hour from commercial and from industrial customers across the state in 2024; a large data center usually negotiates its own contract.

Nearest power plants

PlantFuelCapacityDistance
Bergenmand Solar Partners, LLC MahwahSolar1.0 MW0.1 mi
RamapoSolar4.2 MW1.1 mi
Good Samaritan HospitalOil1.9 MW2.4 mi
HillburnNatural Gas46.5 MW3.4 mi
Lederle LaboratoriesNatural Gas23.4 MW7.0 mi
NY3 BatteryOther Fossil3.0 MW8.4 mi
100 Brook Hill Drive SolarSolar2.0 MW8.9 mi
Rockland Bakery Inc.Natural Gas1.6 MW9.0 mi
William Paterson UniversitySolar2.3 MW9.0 mi
St. Josephs WayneSolar2.5 MW9.5 mi

The largest power plant within 50 miles is Ravenswood, a 2,096 MW natural gas plant 25 miles away.

Operating plants from EIA Form 860, by straight-line distance. Being close doesn't mean a plant supplies the site.

More

Data centers in New Jersey · Data centers in Bergen County · U.S. data center map

About this data

The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.

The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.

How the power-plant data is built · Data centers near me