46 Equinix data centers are mapped in the U.S. on OpenStreetMap, in 6 states: 47 buildings covering about 110 acres (4,778,000 sq ft) of roof. Weighted by building size, the grids they sit on average 578 lb of CO₂ per megawatt-hour, 24% cleaner than the U.S. grid as a whole (765 lb).
Data centerUnder construction
| Grid region | Sites | CO₂ lb/MWh |
|---|---|---|
| Mid-Atlantic | 25 | 594 |
| California | 14 | 426 |
| Ohio Valley | 3 | 911 |
| Virginia/Carolinas | 2 | 590 |
| Texas (ERCOT) | 1 | 733 |
| Northwest | 1 | 631 |
| Data center | Place | Roof area |
|---|---|---|
| Equinix SV5 | San Jose, California | 3.8 ac |
| Equinix SV1 | San Jose, California | 3.1 ac |
| Equinix SV4 | Sunnyvale, California | 2.8 ac |
| Equinix San Jose SV3 | San Jose, California | 2.5 ac |
| Equinix data center, Torrance | Torrance, California | 2.5 ac |
| Equinix SV10 | San Jose, California | 2.0 ac |
| Equinix Santa Clara SV2 | Santa Clara, California | 1.9 ac |
| Equinix SV11 | San Jose, California | 1.8 ac |
| Equinix SV17 | Santa Clara, California | 1.0 ac |
| Equinix SV15 | Santa Clara, California | 0.9 ac |
| Equinix SV16 | Santa Clara, California | 0.6 ac |
| Equinix SV6 | Sunnyvale, California | 0.5 ac |
| Equinix SV14 | Santa Clara, California | 0.5 ac |
| Equinix SV8 | Palo Alto, California | 0.3 ac |
| Equinix Chicago CH3 | Elk Grove Village, Illinois | 3.8 ac |
| Equinix Chicago Data CH7 | Clarendon Hills, Illinois | 1.1 ac |
| Equinix Chicago Data Center - CH1 | Chicago, Illinois | — |
| Equinix New York Secaucus NY2 | Secaucus, New Jersey | 9.2 ac |
| Equinix New York Secaucus NY4 | Secaucus, New Jersey | 7.2 ac |
| Equinix NY3 | Secaucus, New Jersey | 6.3 ac |
| Equinix New York Secaucus NY5 | Secaucus, New Jersey | 4.8 ac |
| Equinix Secaucus NY6 | Secaucus, New Jersey | 1.6 ac |
| Equinix NY7 Data Center | North Bergen, New Jersey | 1.6 ac |
| Equinix data center, South Bound Brook | South Bound Brook, New Jersey | 1.4 ac |
| Equinix Infomart | Dallas, Texas | 5.5 ac |
| Equinix DC14 | Manassas, Virginia | 6.4 ac |
| Equinix DC2 | Ashburn, Virginia | 3.5 ac |
| Equinix DC10 | Ashburn, Virginia | 3.5 ac |
| Equinix DC11 | Ashburn, Virginia | 3.0 ac |
| Equinix DC13 | Ashburn, Virginia | 2.9 ac |
| Equinix DC4 | Ashburn, Virginia | 2.3 ac |
| Equinix DC3 | Ashburn, Virginia | 2.3 ac |
| Equinix DC12 | Ashburn, Virginia | 2.2 ac |
| Equinix DC5 | Ashburn, Virginia | 2.1 ac |
| Equinix DC17 | Ashburn, Virginia | 2.0 ac |
| Equinix DC16 | Ashburn, Virginia | 2.0 ac |
| Equinix DC7 | Vienna, Virginia | 1.8 ac |
| Equinix DC21 | Ashburn, Virginia | 1.8 ac |
| Equinix DC15 | Ashburn, Virginia | 1.8 ac |
| Equinix DC6 | Ashburn, Virginia | 1.6 ac |
| Equinix DC22 | Ashburn, Virginia | 1.4 ac |
| Equinix DC1 | Ashburn, Virginia | 1.4 ac |
| Equinix DC97 | Herndon, Virginia | 1.0 ac |
| Equinix Ashburn DC18 | Ashburn, Virginia | — |
| Equinix CU2 | Culpeper, Virginia | — |
| Equinix SE3 Data Center | Seattle, Washington | 0.3 ac |
The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.
The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.