Equinix DC13 is a data center in Ashburn, Loudoun County, Virginia. It is mapped as 1 building covering about 2.9 acres (125,000 sq ft). Its power comes off the Mid-Atlantic grid (PJM Interconnection), which runs on 54% natural gas, 36% nuclear and 5% coal.
This data centerOther data centersPower plants (colored by fuel)
| Address | 21830 Uunet Way, Ashburn VA 20147 |
|---|---|
| County | Loudoun County, Virginia |
| Coordinates | 39.01250, -77.47545 |
| Website | www.equinix.com/data-centers/americas-colocation/united-sta… |
| On OpenStreetMap | way/300969250 |
A data center doesn't run on the nearest power plant. It draws from the regional grid, where electricity from every plant on the system mixes. This site is in EPA's Mid-Atlantic grid region, and the county's largest utility is on the PJM Interconnection grid. In 2023, the region's electricity was 54% natural gas, 36% nuclear and 5% coal.
Each megawatt-hour carried about 594 lb of CO₂, 22% cleaner than the U.S. grid as a whole (765 lb).
Share of electricity generated in EPA's Mid-Atlantic grid region (RFCE) in 2023, from eGRID. 286 TWh from 815 plants.
Mappers list this site's IT capacity as 12.0 MW. Running at that load all year, before any cooling, it would use about 105,120 MWh: as much electricity as roughly 10,000 U.S. homes (EIA's average is 10,791 kWh a year), and on this grid about 31,000 tons of CO₂.
| Utility | Business rate | Industrial rate |
|---|---|---|
| Virginia Electric & Power Co | 8.9¢ | 7.9¢ |
| Northern Virginia Elec Coop | 6.2¢ | 7.4¢ |
Utilities that report serving Loudoun County to the EIA (Form 861, 2024), largest first. Rates are each utility's average revenue per kilowatt-hour from commercial and from industrial customers across the state in 2024; a large data center usually negotiates its own contract.
| Plant | Fuel | Capacity | Distance |
|---|---|---|---|
| Potomac Energy Center, LLC | Natural Gas | 812 MW | 4.9 mi |
| Reston Town Center Solar 1 | Solar | 1.0 MW | 7.3 mi |
| MNCPPC Germantown Solar | Solar | 1.0 MW | 12.7 mi |
| Montgomery County Resource Recovery | Biomass | 67.8 MW | 13.0 mi |
| Boyd Soccerplex | Solar | 1.0 MW | 13.1 mi |
| Dickerson Power | Natural Gas | 326 MW | 13.6 mi |
| Montgomery County Solar | Solar | 1.9 MW | 14.6 mi |
| NIST Solar | Solar | 4.0 MW | 16.0 mi |
| VA- US Foods- Manassas | Solar | 2.0 MW | 16.2 mi |
| Church Street Plant | Oil | 4.3 MW | 18.0 mi |
The largest power plant within 50 miles is Warren County, a 1,472 MW natural gas plant 38 miles away.
Operating plants from EIA Form 860, by straight-line distance. Being close doesn't mean a plant supplies the site.
| Data center | Roof area | Distance |
|---|---|---|
| Sabey Ashburn Building A | 2.4 ac | 0.1 mi |
| Aligned IAD-02 | 4.8 ac | 0.1 mi |
| IAD | 4.2 ac | 0.1 mi |
| CloudHQ LC5 under construction | 2.6 ac | 0.2 mi |
| Sabey Ashburn Building C | 3.3 ac | 0.3 mi |
| Aligned IAD-01 | 3.2 ac | 0.3 mi |
| Sabey Ashburn Building B | 3.0 ac | 0.3 mi |
| NTT VA7 | 3.1 ac | 0.3 mi |
| NTT VA6 | 2.1 ac | 0.3 mi |
| DataBank IAD1 | 3.3 ac | 0.4 mi |
| CloudHQ LC11 under construction | 5.2 ac | 0.4 mi |
| NTT VA8 under construction | 2.7 ac | 0.4 mi |
| NTT VA5 | 2.8 ac | 0.4 mi |
| CloudHQ LC14 under construction | 6.4 ac | 0.4 mi |
| NTT VA3 | 5.3 ac | 0.4 mi |
And 181 more within 5 miles.
Data centers in Virginia · Data centers in Loudoun County · All Equinix data centers · U.S. data center map
The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.
The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.