Dickerson Power is a natural gas power plant in Maryland with a nameplate capacity of 326 MW. It generates roughly 287.8k MWh per year — enough to power about 27,406 average U.S. homes.
Its capacity factor of 10% reflects intermittent or peaking operation. At 1517 lb CO₂/MWh, its emission rate sits above the national grid average of roughly 800 lb/MWh.
Run flat out every hour of the year, Dickerson Power could make 2.9M MWh. In 2023 it made 287.8k MWh — the same as running at full power 10 hours in every 100.
Peaking or variableCapacity factor 10%. It runs only part of the time — when demand is high, or when the wind or sun allows.
How it works
Why the numbers look like this: a combustion turbine can go from cold to full power in well under an hour, often minutes, so grid operators call on these plants for the few hottest or coldest hours of the year. A low capacity factor here is the job description, not a failure.
This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.
| Address | 21230 Martinsburg Rd. |
|---|---|
| City | Dickerson |
| County | Montgomery County |
| State | Maryland |
| ZIP | 20842 |
| Coordinates | 39.20970, -77.46440 |
| Operator | Dickerson Power, LLC |
| ID | Technology | Fuel | Nameplate capacity | Status | Online |
|---|---|---|---|---|---|
| GT2 | Natural Gas Fired Combustion Turbine | Natural Gas | 163 MW | Operating | 1992 |
| GT3 | Natural Gas Fired Combustion Turbine | Natural Gas | 163 MW | Operating | 1992 |
| CO₂ | 218.3k metric tons |
|---|---|
| SO₂ | 1 metric tons |
| NOₓ | 169 metric tons |
| CO₂ Rate | 1517 lb/MWh |
Annual totals and CO₂ rate reported by EPA eGRID for 2023. Reference averages are approximate U.S.-wide figures from the same dataset.
| NERC Region | RFC |
|---|---|
| Balancing Authority | PJM Interconnection, LLC |
Natural gas plants are the workhorse of the modern grid. Combined-cycle units achieve very high efficiency and can ramp up and down quickly to balance variable renewables. They emit roughly half the CO₂ per MWh of coal and far less of other pollutants, but they still release upstream methane during fuel extraction.
| Data center | Distance |
|---|---|
| Vantage VA3 | 9.4 mi |
| STACK NVA06 | 10.4 mi |
| Microsoft Leesburg Building 2 | 10.7 mi |
| Microsoft Leesburg Building 1 | 10.8 mi |
| Microsoft Leesburg Building 4 | 10.9 mi |
| Microsoft Leesburg Building 3 | 11.0 mi |
| Microsoft Leesburg Building 5 | 11.1 mi |
| Visa Operations Center East | 11.2 mi |
Data centers mapped on OpenStreetMap within 25 miles. A data center draws from the regional grid, so being near this plant doesn't mean it buys this plant's power. U.S. data center map