STACK NVA06

STACK NVA06 is a data center run by Stack Infrastructure in Leesburg, Loudoun County, Virginia. It is mapped as 2 buildings covering about 7.3 acres (318,000 sq ft). Its power comes off the Virginia/Carolinas grid (PJM Interconnection), which runs on 40% nuclear, 39% natural gas and 10% coal.

OperatorStack Infrastructureas mapped
Roof area7.3 ac2 buildings
Grid CO₂590 lbper MWh, SRVC region
Nearest plant1.9 miPotomac Energy Center, LLC
IT power72.0 MWas mapped

Location

This data centerOther data centersPower plants (colored by fuel)

Address19275 Compass Creek Parkway SE, Leesburg VA 20177
CountyLoudoun County, Virginia
Coordinates39.08143, -77.56519
Websitewww.stackinfra.com/locations/americas/northern-virginia/nva…
On OpenStreetMapway/1443922535, way/1566629297

What powers STACK NVA06

A data center doesn't run on the nearest power plant. It draws from the regional grid, where electricity from every plant on the system mixes. This site is in EPA's Virginia/Carolinas grid region, and the county's largest utility is on the PJM Interconnection grid. In 2023, the region's electricity was 40% nuclear, 39% natural gas, 10% coal and 6% solar.

Each megawatt-hour carried about 590 lb of CO₂, 23% cleaner than the U.S. grid as a whole (765 lb).

Nuclear 40%Natural Gas 39%Coal 10%Solar 6%Biomass 2%

Share of electricity generated in EPA's Virginia/Carolinas grid region (SRVC) in 2023, from eGRID. 321 TWh from 1,273 plants.

Mappers list this site's IT capacity as 72.0 MW. Running at that load all year, before any cooling, it would use about 630,720 MWh: as much electricity as roughly 58,000 U.S. homes (EIA's average is 10,791 kWh a year), and on this grid about 186,000 tons of CO₂.

Utilities that serve Loudoun County

UtilityTypeGridBusiness rateIndustrial rate
Virginia Electric & Power CoInvestor OwnedPJM Interconnection8.9¢7.9¢
Northern Virginia Elec CoopCooperativePJM Interconnection6.2¢7.4¢

Utilities that report serving Loudoun County to the EIA (Form 861, 2024), largest first. Rates are each utility's average revenue per kilowatt-hour from commercial and from industrial customers across the state in 2024; a large data center usually negotiates its own contract.

Nearest power plants

PlantFuelCapacityDistance
Potomac Energy Center, LLCNatural Gas812 MW1.9 mi
Montgomery County Resource RecoveryBiomass67.8 MW10.1 mi
Dickerson PowerNatural Gas326 MW10.4 mi
Reston Town Center Solar 1Solar1.0 MW13.9 mi
MNCPPC Germantown SolarSolar1.0 MW14.1 mi
Boyd SoccerplexSolar1.0 MW14.5 mi
Millville Hydro StationHydroelectric2.8 MW17.7 mi
Montgomery County SolarSolar1.9 MW17.8 mi
Montgomery County Correctional FacilitySolar1.4 MW18.1 mi
NIST SolarSolar4.0 MW19.0 mi

The largest power plant within 50 miles is Warren County, a 1,472 MW natural gas plant 34 miles away.

Operating plants from EIA Form 860, by straight-line distance. Being close doesn't mean a plant supplies the site.

Other data centers within 5 miles

Data centerOperatorRoof areaDistance
Microsoft Leesburg Building 2Microsoft2.2 ac0.4 mi
Microsoft Leesburg Building 1Microsoft3.5 ac0.5 mi
Microsoft Leesburg Building 3Microsoft5.5 ac0.9 mi
Microsoft Leesburg Building 4Microsoft5.6 ac0.9 mi
Microsoft Leesburg Building 5Microsoft3.5 ac1.1 mi
Amazon IAD-667Amazon Web Services2.4 ac1.9 mi
Amazon IAD-668Amazon Web Services3.4 ac2.0 mi
Amazon IAD-669Amazon Web Services3.2 ac2.1 mi
Amazon Web Services data center, LeesburgAmazon Web Services2.7 ac2.2 mi
Google Leesburg Building 1Google3.2 ac2.4 mi
Stonewall Creek Business ParkGoogle3.2 ac2.5 mi
Google Leesburg Building 3Google6.9 ac2.7 mi
42254 THUNDERBALL DRTrue North Data Solutions1.8 ac2.9 mi
42310 THUNDERBALL DRTrue North Data Solutions1.8 ac2.9 mi
Compass IAD IECompass Datacenters3.9 ac3.0 mi

And 4 more within 5 miles.

More

Data centers in Virginia · Data centers in Loudoun County · All Stack Infrastructure data centers · U.S. data center map

About this data

The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.

The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.

How the power-plant data is built · Data centers near me