18 Stack Infrastructure data centers are mapped in the U.S. on OpenStreetMap, in 5 states: 25 buildings covering about 77.7 acres (3,383,000 sq ft) of roof. Weighted by building size, the grids they sit on average 633 lb of CO₂ per megawatt-hour, 17% cleaner than the U.S. grid as a whole (765 lb).
Data centerUnder construction
| Grid region | Sites | CO₂ lb/MWh |
|---|---|---|
| Virginia/Carolinas | 10 | 590 |
| Northwest | 3 | 631 |
| California | 2 | 426 |
| Mid-Atlantic | 1 | 594 |
| Southeast | 1 | 840 |
| Ohio Valley | 1 | 911 |
| Data center | Place | Roof area |
|---|---|---|
| Stack Infrastructure data center, San Jose | San Jose, California | 4.2 ac |
| STACK SVY02 | Santa Clara, California | 3.1 ac |
| Stack Infrastructure data center, Lithia Springs | Lithia Springs, Georgia | 6.5 ac |
| STACK Chicago CHI01 | Elk Grove Village, Illinois | 7.0 ac |
| Stack Infrastructure - POR03 | Hillsboro, Oregon | 8.6 ac |
| Stack Infrastructure - POR02 | Hillsboro, Oregon | 4.9 ac |
| Stack Infrastructure - POR01 | Hillsboro, Oregon | 2.1 ac |
| STACK NVA02x | Manassas, Virginia | 7.5 ac |
| STACK NVA06 | Leesburg, Virginia | 7.3 ac |
| STACK NVA05B | Manassas, Virginia | 4.1 ac |
| STACK NVA01A | Sterling, Virginia | 4.1 ac |
| STACK NVA05C | Manassas, Virginia | 3.6 ac |
| STACK NVA05A | Manassas, Virginia | 3.2 ac |
| STACK NVA02E | Manassas, Virginia | 3.1 ac |
| STACK NVA02D | Manassas, Virginia | 3.0 ac |
| STACK NVA02A | Manassas, Virginia | 2.6 ac |
| STACK NVA02B | Manassas, Virginia | 2.6 ac |
| STACK NVA02C | Manassas, Virginia | 0.3 ac |
The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.
The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.