CloudHQ LC14 is a data center under construction in Dulles, Loudoun County, Virginia. It is mapped as 1 building covering about 6.4 acres (277,000 sq ft). Its power comes off the Mid-Atlantic grid (PJM Interconnection), which runs on 54% natural gas, 36% nuclear and 5% coal.
This data centerOther data centersPower plants (colored by fuel)
| County | Loudoun County, Virginia |
|---|---|
| Coordinates | 39.00630, -77.47534 |
| On OpenStreetMap | way/1560822518 |
A data center doesn't run on the nearest power plant. It draws from the regional grid, where electricity from every plant on the system mixes. This site is in EPA's Mid-Atlantic grid region, and the county's largest utility is on the PJM Interconnection grid. In 2023, the region's electricity was 54% natural gas, 36% nuclear and 5% coal.
Each megawatt-hour carried about 594 lb of CO₂, 22% cleaner than the U.S. grid as a whole (765 lb).
Share of electricity generated in EPA's Mid-Atlantic grid region (RFCE) in 2023, from eGRID. 286 TWh from 815 plants.
Mappers list this site's IT capacity as 108 MW. Running at that load all year, before any cooling, it would use about 946,080 MWh: as much electricity as roughly 88,000 U.S. homes (EIA's average is 10,791 kWh a year), and on this grid about 281,000 tons of CO₂.
| Utility | Business rate | Industrial rate |
|---|---|---|
| Virginia Electric & Power Co | 8.9¢ | 7.9¢ |
| Northern Virginia Elec Coop | 6.2¢ | 7.4¢ |
Utilities that report serving Loudoun County to the EIA (Form 861, 2024), largest first. Rates are each utility's average revenue per kilowatt-hour from commercial and from industrial customers across the state in 2024; a large data center usually negotiates its own contract.
| Plant | Fuel | Capacity | Distance |
|---|---|---|---|
| Potomac Energy Center, LLC | Natural Gas | 812 MW | 5.2 mi |
| Reston Town Center Solar 1 | Solar | 1.0 MW | 7.1 mi |
| MNCPPC Germantown Solar | Solar | 1.0 MW | 13.0 mi |
| Boyd Soccerplex | Solar | 1.0 MW | 13.4 mi |
| Montgomery County Resource Recovery | Biomass | 67.8 MW | 13.5 mi |
| Dickerson Power | Natural Gas | 326 MW | 14.1 mi |
| Montgomery County Solar | Solar | 1.9 MW | 14.8 mi |
| VA- US Foods- Manassas | Solar | 2.0 MW | 15.8 mi |
| NIST Solar | Solar | 4.0 MW | 16.2 mi |
| Church Street Plant | Oil | 4.3 MW | 17.6 mi |
The largest power plant within 50 miles is Warren County, a 1,472 MW natural gas plant 38 miles away.
Operating plants from EIA Form 860, by straight-line distance. Being close doesn't mean a plant supplies the site.
| Data center | Roof area | Distance |
|---|---|---|
| CloudHQ LC11 under construction | 5.2 ac | 0.1 mi |
| CloudHQ LC12 under construction | 3.2 ac | 0.2 mi |
| CloudHQ LC5 under construction | 2.6 ac | 0.2 mi |
| Aligned IAD-02 | 4.8 ac | 0.3 mi |
| CloudHQ LC4 | 11 ac | 0.3 mi |
| Digital Realty IAD40 | 2.5 ac | 0.4 mi |
| Digital Realty IAD38 | 2.6 ac | 0.4 mi |
| Digital Realty IAD36 | 2.6 ac | 0.4 mi |
| Equinix DC13 | 2.9 ac | 0.4 mi |
| Digital Realty Devin Shafron Building A | 3.0 ac | 0.4 mi |
| Digital Realty IAD39 | 13 ac | 0.4 mi |
| CloudHQ LC8 under construction | 6.4 ac | 0.5 mi |
| Digital Realty IAD37 | 3.3 ac | 0.5 mi |
| IAD | 4.2 ac | 0.5 mi |
| Digital Realty IAD73 | 3.1 ac | 0.5 mi |
And 183 more within 5 miles.
Data centers in Virginia · Data centers in Loudoun County · All CloudHQ data centers · U.S. data center map
The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.
The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.