CloudHQ Data Centers

12 CloudHQ data centers are mapped in the U.S. on OpenStreetMap, in 1 state: 12 buildings covering about 77.3 acres (3,366,000 sq ft) of roof. Weighted by building size, the grids they sit on average 593 lb of CO₂ per megawatt-hour, 23% cleaner than the U.S. grid as a whole (765 lb).

Sites12mapped
States1with a site
Buildings12mapped footprints
Roof area77 acbuilding footprints

Map of CloudHQ data centers

Data centerUnder construction

By grid region

Grid regionSitesCO₂ lb/MWhLargest sources
Mid-Atlantic959454% natural gas, 36% nuclear and 5% coal
Virginia/Carolinas359040% nuclear, 39% natural gas and 10% coal

Every mapped site

Data centerPlaceGrid regionRoof area
CloudHQ LC1Ashburn, VirginiaMid-Atlantic11 ac
CloudHQ LC4Ashburn, VirginiaMid-Atlantic11 ac
CloudHQ MCC1Manassas, VirginiaVirginia/Carolinas9.1 ac
CloudHQ MCC2Manassas, VirginiaVirginia/Carolinas8.0 ac
CloudHQ LC8 under constructionAshburn, VirginiaMid-Atlantic6.4 ac
CloudHQ LC14 under constructionDulles, VirginiaMid-Atlantic6.4 ac
CloudHQ LC2Ashburn, VirginiaMid-Atlantic5.7 ac
CloudHQ LC3Ashburn, VirginiaMid-Atlantic5.4 ac
CloudHQ LC11 under constructionAshburn, VirginiaMid-Atlantic5.2 ac
CloudHQ LC12 under constructionAshburn, VirginiaMid-Atlantic3.2 ac
CloudHQ MCC6AManassas, VirginiaVirginia/Carolinas2.8 ac
CloudHQ LC5 under constructionDulles, VirginiaMid-Atlantic2.6 ac

About this data

The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.

The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.

How the power-plant data is built · Data centers near me