Prime Data Centers

Prime Data Centers is a data center in Elk Grove Village, Cook County, Illinois. It is mapped as 2 buildings covering about 5.1 acres (224,000 sq ft). Its power comes off the Ohio Valley grid (PJM Interconnection), which runs on 38% natural gas, 28% nuclear and 25% coal.

OperatorPrimeas mapped
Roof area5.1 ac2 buildings
Grid CO₂911 lbper MWh, RFCW region
Nearest plant1.7 miDes Plaines 7-SLCHI819

Location

This data centerOther data centersPower plants (colored by fuel)

CountyCook County, Illinois
Coordinates42.02347, -87.96180
On OpenStreetMapway/1316005112, way/1571528373

What powers Prime Data Centers

A data center doesn't run on the nearest power plant. It draws from the regional grid, where electricity from every plant on the system mixes. This site is in EPA's Ohio Valley grid region, and the county's largest utility is on the PJM Interconnection grid. In 2023, the region's electricity was 38% natural gas, 28% nuclear, 25% coal and 5% wind.

Each megawatt-hour carried about 911 lb of CO₂, 19% more carbon per megawatt-hour than the U.S. grid as a whole (765 lb).

Natural Gas 38%Nuclear 28%Coal 25%Wind 5%

Share of electricity generated in EPA's Ohio Valley grid region (RFCW) in 2023, from eGRID. 524 TWh from 824 plants.

Utilities that serve Cook County

UtilityTypeGridBusiness rateIndustrial rate
Commonwealth Edison CoInvestor OwnedPJM Interconnection12.3¢7.4¢

Utilities that report serving Cook County to the EIA (Form 861, 2024), largest first. Rates are each utility's average revenue per kilowatt-hour from commercial and from industrial customers across the state in 2024; a large data center usually negotiates its own contract.

Nearest power plants

PlantFuelCapacityDistance
Des Plaines 7-SLCHI819Solar1.4 MW1.7 mi
Northwest Community HospitalNatural Gas4.4 MW3.5 mi
MTHS Co-Gen BuildingsNatural Gas1.2 MW5.8 mi
10701 Seymour Ave East 1 CSGSolar2.9 MW6.2 mi
10601 Seymour Ave East 2 CSGSolar2.0 MW6.2 mi
Copenhagen CtSolar3.5 MW6.2 mi
NorthropGrummanSolar(Rolling Meadows,IL)Solar1.1 MW6.3 mi
Franklin Park 3-SLCHI803Solar1.2 MW7.4 mi
Northlake 3-SLCHI303Solar1.6 MW7.7 mi
Albertsons at Melrose ParkSolar1.9 MW9.2 mi

The largest power plant within 50 miles is Dresden Generating Station, a 2,019 MW nuclear plant 47 miles away.

Operating plants from EIA Form 860, by straight-line distance. Being close doesn't mean a plant supplies the site.

Other data centers within 5 miles

Data centerOperatorRoof areaDistance
Microsoft CHI12 Data CenterMicrosoft3.4 ac0.5 mi
Microsoft CHI13 Data Center under constructionMicrosoft3.4 ac0.5 mi
Microsoft CHI11 Data CenterMicrosoft2.4 ac0.5 mi
T5 Chicago II Data CenterT5 Data Centers3.7 ac0.7 mi
Stream Data Centers data center, Elk Grove Village under constructionStream Data Centers3.7 ac1.0 mi
STACK Chicago CHI01Stack Infrastructure7.0 ac1.2 mi
Aligned Data CenterAligned5.9 ac1.3 mi
EdgeConneX Data Center under constructionEdgeConneX5.9 ac1.3 mi
Stream Chicago IStream3.3 ac1.5 mi
Equinix Chicago CH3Equinix3.8 ac1.6 mi
EdgeConneX CHI02EdgeConneX1.5 ac1.6 mi
EdgeConneX CHI01EdgeConneX2.7 ac1.7 mi
Stream Chicago IIStream4.9 ac1.7 mi
Digital Realty CH3Digital Realty7.9 ac2.0 mi
Digital Realty CH1Digital Realty11 ac2.0 mi

And 10 more within 5 miles.

More

Data centers in Illinois · Data centers in Cook County · All Prime data centers · U.S. data center map

About this data

The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.

The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.

How the power-plant data is built · Data centers near me