Electric generating plantEIA plant no. 64918

NorthropGrummanSolar(Rolling Meadows,IL)

Type
Solar Photovoltaic
Nameplate capacity
1.1 MW
Units
1
In service since
2020
Operator
DG Illinois Solar, LLC
Location
Rolling Meadows, Cook County, Illinois
Rated 648th largest in Illinois · 13658th of 14,761 in the U.S. · by nameplate

NorthropGrummanSolar(Rolling Meadows,IL) is a solar power plant in Illinois with a nameplate capacity of 1.1 MW. It generates roughly 1.5k MWh per year — enough to power about 144 average U.S. homes.

Its capacity factor of 16% reflects intermittent or peaking operation.

On paper vs. what it actually made

each square = 1 hour at full nameplate

Run flat out every hour of the year, NorthropGrummanSolar(Rolling Meadows,IL) could make 9.6k MWh. In 2023 it made 1.5k MWh — the same as running at full power 16 hours in every 100.

Nameplate, full year9.6k MWh1.1 MW × 8,760 hours
Actually generated1.5k MWhEPA eGRID, 2023 · ≈144 homes

Peaking or variableCapacity factor 16%. It runs only part of the time — when demand is high, or when the wind or sun allows.

How it works

A solar farm

DCAC1panels turn light into DC current2inverters make AC3to the grid
  1. Silicon cells in each panel turn sunlight directly into direct current (DC). Nothing moves; nothing burns.
  2. Inverters convert DC into the alternating current (AC) the grid uses.
  3. A substation raises the voltage and sends it onto transmission lines.

Why the numbers look like this: panels make nothing at night and less in winter, so even a well-placed U.S. solar farm averages around a quarter of its nameplate over a year. Watch the monthly bars: they swell in summer and shrink in December.

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

Natural GasSolarBiomass

Location

Address600 S. Hicks Rd
CityRolling Meadows
CountyCook County
StateIllinois
ZIP60008
Coordinates42.09972, -88.03104
OperatorDG Illinois Solar, LLC

Generators (1)

IDTechnologyFuelNameplate capacityStatusOnline
NGCILSolar PhotovoltaicSolar1.1 MWOperating2020

Grid context

NERC RegionMRO
Balancing AuthorityPJM Interconnection, LLC

About Solar plants

Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.

Other plants in Cook County

View all plants in Cook County →

Data centers near NorthropGrummanSolar(Rolling Meadows,IL)

Data centerOperatorDistance
Aligned Data CenterAligned5.2 mi
Microsoft CHI13 Data Center under constructionMicrosoft6.0 mi
T5 Chicago II Data CenterT5 Data Centers6.0 mi
Microsoft CHI12 Data CenterMicrosoft6.0 mi
Microsoft CHI11 Data CenterMicrosoft6.1 mi
Prime Data CentersPrime6.3 mi
STACK Chicago CHI01Stack Infrastructure7.2 mi
Stream Data Centers data center, Elk Grove Village under constructionStream Data Centers7.3 mi

Data centers mapped on OpenStreetMap within 25 miles. A data center draws from the regional grid, so being near this plant doesn't mean it buys this plant's power. U.S. data center map