NCSA Petascale Computing Facility is a data center in Champaign, Champaign County, Illinois. It is mapped as 1 building covering about 1.0 acres (45,000 sq ft). Its power comes off the Mid-Mississippi grid (MISO (Midcontinent ISO)), which runs on 51% coal, 17% natural gas and 16% nuclear.
This data centerOther data centersPower plants (colored by fuel)
| Address | 1725 South Oak Street, Champaign IL 61820 |
|---|---|
| County | Champaign County, Illinois |
| Coordinates | 40.09524, -88.24201 |
| On OpenStreetMap | way/138260136 |
A data center doesn't run on the nearest power plant. It draws from the regional grid, where electricity from every plant on the system mixes. This site is in EPA's Mid-Mississippi grid region, and the county's largest utility is on the MISO (Midcontinent ISO) grid. In 2023, the region's electricity was 51% coal, 17% natural gas, 16% nuclear and 13% wind.
Each megawatt-hour carried about 1,238 lb of CO₂, 62% more carbon per megawatt-hour than the U.S. grid as a whole (765 lb).
Share of electricity generated in EPA's Mid-Mississippi grid region (SRMW) in 2023, from eGRID. 106 TWh from 243 plants.
| Utility | Business rate | Industrial rate |
|---|---|---|
| Ameren Illinois Company | 13.0¢ | 4.8¢ |
| Corn Belt Energy Corporation | 13.3¢ | 7.4¢ |
| Eastern Illinois Elec Coop | 15.4¢ | 12.8¢ |
Utilities that report serving Champaign County to the EIA (Form 861, 2024), largest first. Rates are each utility's average revenue per kilowatt-hour from commercial and from industrial customers across the state in 2024; a large data center usually negotiates its own contract.
| Plant | Fuel | Capacity | Distance |
|---|---|---|---|
| TAC-Distributed Energy Resource Hybrid | Solar | 1.5 MW | 0.4 mi |
| University of Illinois Abbott Power Plt | Natural Gas | 80.3 MW | 0.7 mi |
| Phoenix Solar South Farms LLC Solar Farm | Solar | 4.7 MW | 0.9 mi |
| SCS COUNTY 012631 Champaign, LLC | Solar | 2.0 MW | 1.7 mi |
| Northern Cardinal Solar SCS IL 1, LLC | Solar | 10.0 MW | 1.7 mi |
| Solar Star Urbana Landfill Central | Solar | 1.9 MW | 3.8 mi |
| Champaign Solar, LLC | Solar | 3.5 MW | 3.8 mi |
| Solar Star Urbana Landfill East | Solar | 1.9 MW | 3.9 mi |
| CED Champaign Solar LLC | Solar | 1.6 MW | 4.0 mi |
| IL Sidney Project1 | Solar | 2.0 MW | 11.3 mi |
The largest power plant within 50 miles is Cayuga, a 1,185 MW coal plant 45 miles away.
Operating plants from EIA Form 860, by straight-line distance. Being close doesn't mean a plant supplies the site.
The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.
The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.