21 NTT data centers are mapped in the U.S. on OpenStreetMap, in 6 states: 26 buildings covering about 92.2 acres (4,015,000 sq ft) of roof. Weighted by building size, the grids they sit on average 632 lb of CO₂ per megawatt-hour, 17% cleaner than the U.S. grid as a whole (765 lb).
Data centerUnder construction
| Grid region | Sites | CO₂ lb/MWh |
|---|---|---|
| Mid-Atlantic | 9 | 594 |
| California | 4 | 426 |
| Ohio Valley | 4 | 911 |
| Northwest | 2 | 631 |
| Virginia/Carolinas | 1 | 590 |
| Texas (ERCOT) | 1 | 733 |
| Data center | Place | Roof area |
|---|---|---|
| RagingWire CA2 | Sacramento, California | 4.7 ac |
| RagingWire CA1 | Sacramento, California | 4.4 ac |
| RagingWire CA3 | Sacramento, California | 3.5 ac |
| NTT Silicon Valley SV1 Data Center | Santa Clara, California | 0.9 ac |
| NTT Chicago CH2 | Itasca, Illinois | 2.6 ac |
| NTT Chicago CH1 | Itasca, Illinois | 2.6 ac |
| NTT Chicago CH4 | Itasca, Illinois | 2.3 ac |
| NTT Chicago CH3 | Itasca, Illinois | 1.9 ac |
| NTT RagingWire DC - Hillsboro | Hillsboro, Oregon | 11 ac |
| NTT data center, Richardson | Richardson, Texas | 16 ac |
| NTT VA10 | Gainesville, Virginia | 11 ac |
| NTT VA3 | Ashburn, Virginia | 5.3 ac |
| NTT VA4 | Ashburn, Virginia | 3.7 ac |
| NTT VA1 | Ashburn, Virginia | 3.2 ac |
| NTT VA7 | Ashburn, Virginia | 3.1 ac |
| NTT VA5 | Ashburn, Virginia | 2.8 ac |
| NTT VA8 under construction | Ashburn, Virginia | 2.7 ac |
| NTT VA9 | Ashburn, Virginia | 2.5 ac |
| NTT VA6 | Ashburn, Virginia | 2.1 ac |
| NTT VA2 | Ashburn, Virginia | 1.7 ac |
| NTT Data Quincy | Quincy, Washington | 5.0 ac |
The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.
The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.