Accelera Data Systems

Accelera Data Systems is a data center in Phoenix, Maricopa County, Arizona. Its power comes off the Southwest (Arizona/New Mexico) grid (Arizona Public Service), which runs on 49% natural gas, 18% nuclear and 11% coal.

OperatorOperator not recordedas mapped
Grid CO₂703 lbper MWh, AZNM region
Nearest plant3.7 miScatter Wash 2

Location

This data centerOther data centersPower plants (colored by fuel)

CountyMaricopa County, Arizona
Coordinates33.66475, -112.11171
On OpenStreetMapnode/11113161710

What powers Accelera Data Systems

A data center doesn't run on the nearest power plant. It draws from the regional grid, where electricity from every plant on the system mixes. This site is in EPA's Southwest (Arizona/New Mexico) grid region, and the county's largest utility is on the Arizona Public Service grid. In 2023, the region's electricity was 49% natural gas, 18% nuclear, 11% coal and 8% solar.

Each megawatt-hour carried about 703 lb of CO₂, close to the U.S. grid as a whole (765 lb).

Natural Gas 49%Nuclear 18%Coal 11%Solar 8%Wind 8%Geothermal 4%Hydroelectric 3%

Share of electricity generated in EPA's Southwest (Arizona/New Mexico) grid region (AZNM) in 2023, from eGRID. 176 TWh from 387 plants.

Utilities that serve Maricopa County

UtilityTypeGridBusiness rateIndustrial rate
Arizona Public Service CoInvestor OwnedArizona Public Service13.2¢10.2¢
Salt River ProjectPolitical SubdivisionSalt River Project10.8¢7.7¢
City of Mesa - (AZ)MunicipalWestern Area Power Administration - Desert Southwest Region14.0¢—
USBIA-San Carlos ProjectFederalWestern Area Power Administration - Desert Southwest Region17.9¢15.7¢
Gila River Indian Utility Authority (GRICUA)CooperativeWestern Area Power Administration - Desert Southwest Region12.5¢—
Electrical Dist No8 MaricopaPolitical SubdivisionArizona Public Service—6.0¢
WAPA-- Western Area Power AdministrationFederalWestern Area Power Administration - Desert Southwest Region2.6¢1.9¢

Utilities that report serving Maricopa County to the EIA (Form 861, 2024), largest first. Rates are each utility's average revenue per kilowatt-hour from commercial and from industrial customers across the state in 2024; a large data center usually negotiates its own contract.

Nearest power plants

PlantFuelCapacityDistance
Scatter Wash 2Battery Storage85.0 MW3.7 mi
Scatter Wash 1Battery Storage170 MW3.7 mi
Paradise Valley H.S. PVSolar1.3 MW6.6 mi
Agua FriaNatural Gas738 MW9.6 mi
Jewish Community Center PVSolar1.1 MW11.6 mi
Desert BloomBattery Storage150 MW12.4 mi
WestwingBattery Storage200 MW12.7 mi
El Sol BESSOther Fossil50.0 MW13.0 mi
Lake Pleasant WTPSolar6.5 MW13.1 mi
Beehive Energy StorageBattery Storage250 MW13.2 mi

The largest power plant within 50 miles is Palo Verde, a 4,210 MW nuclear plant 47 miles away.

Operating plants from EIA Form 860, by straight-line distance. Being close doesn't mean a plant supplies the site.

Other data centers within 5 miles

Data centerOperatorRoof areaDistance
Aligned Energy Data CenterAligned12 ac0.4 mi
Flexential Phoenix - Deer ValleyFlexential2.5 ac1.6 mi

More

Data centers in Arizona · Data centers in Maricopa County · U.S. data center map

About this data

The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.

The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.

How the power-plant data is built · Data centers near me