VaultLogix is a data center in Scottsdale, Maricopa County, Arizona. Its power comes off the Southwest (Arizona/New Mexico) grid (Arizona Public Service), which runs on 49% natural gas, 18% nuclear and 11% coal.
This data centerOther data centersPower plants (colored by fuel)
| County | Maricopa County, Arizona |
|---|---|
| Coordinates | 33.62737, -111.90170 |
| On OpenStreetMap | node/10796113031 |
A data center doesn't run on the nearest power plant. It draws from the regional grid, where electricity from every plant on the system mixes. This site is in EPA's Southwest (Arizona/New Mexico) grid region, and the county's largest utility is on the Arizona Public Service grid. In 2023, the region's electricity was 49% natural gas, 18% nuclear, 11% coal and 8% solar.
Each megawatt-hour carried about 703 lb of CO₂, close to the U.S. grid as a whole (765 lb).
Share of electricity generated in EPA's Southwest (Arizona/New Mexico) grid region (AZNM) in 2023, from eGRID. 176 TWh from 387 plants.
| Utility | Business rate | Industrial rate |
|---|---|---|
| Arizona Public Service Co | 13.2¢ | 10.2¢ |
| Salt River Project | 10.8¢ | 7.7¢ |
| City of Mesa - (AZ) | 14.0¢ | — |
| USBIA-San Carlos Project | 17.9¢ | 15.7¢ |
| Gila River Indian Utility Authority (GRICUA) | 12.5¢ | — |
| Electrical Dist No8 Maricopa | — | 6.0¢ |
| WAPA-- Western Area Power Administration | 2.6¢ | 1.9¢ |
Utilities that report serving Maricopa County to the EIA (Form 861, 2024), largest first. Rates are each utility's average revenue per kilowatt-hour from commercial and from industrial customers across the state in 2024; a large data center usually negotiates its own contract.
| Plant | Fuel | Capacity | Distance |
|---|---|---|---|
| Jewish Community Center PV | Solar | 1.1 MW | 2.1 mi |
| Paradise Valley H.S. PV | Solar | 1.3 MW | 5.7 mi |
| Scatter Wash 2 | Battery Storage | 85.0 MW | 11.9 mi |
| Scatter Wash 1 | Battery Storage | 170 MW | 11.9 mi |
| AES Es Gilbert | Other Fossil | 10.0 MW | 12.9 mi |
| South Consolidated | Hydroelectric | 1.4 MW | 13.1 mi |
| Crosscut | Hydroelectric | 3.0 MW | 13.2 mi |
| AZ State University - Tempe Campus Solar | Solar | 2.5 MW | 14.1 mi |
| Phoenix Airport East Economy Lot | Solar | 1.1 MW | 14.2 mi |
| Ocotillo | Natural Gas | 806 MW | 14.2 mi |
The largest power plant within 50 miles is Santan, a 1,326 MW natural gas plant 22 miles away.
Operating plants from EIA Form 860, by straight-line distance. Being close doesn't mean a plant supplies the site.
| Data center | Roof area | Distance |
|---|---|---|
| Profit Finder Pro Software | — | 0.0 mi |
| K-Motion Interactive | — | 1.1 mi |
| Iron Mountain Data Centers AZS-1 | — | 1.2 mi |
| DataPro USA Web Development | — | 1.3 mi |
Data centers in Arizona · Data centers in Maricopa County · U.S. data center map
The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.
The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.