Phoenix Airport East Economy Lot is a solar power plant in Arizona with a nameplate capacity of 1.1 MW. It generates roughly 848 MWh per year — enough to power about 80 average U.S. homes.
Its capacity factor of 9% reflects intermittent or peaking operation.
Run flat out every hour of the year, Phoenix Airport East Economy Lot could make 9.6k MWh. In 2023 it made 848 MWh — the same as running at full power 9 hours in every 100.
Peaking or variableCapacity factor 9%. It runs only part of the time — when demand is high, or when the wind or sun allows.
How it works
Why the numbers look like this: panels make nothing at night and less in winter, so even a well-placed U.S. solar farm averages around a quarter of its nameplate over a year. Watch the monthly bars: they swell in summer and shrink in December.
This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.
| Address | 4433, 4445, 4455 E. Sky Harbor |
|---|---|
| City | Phoenix |
| County | Maricopa County |
| State | Arizona |
| ZIP | 85034 |
| Coordinates | 33.43450, -111.98420 |
| Operator | SunStrong Management, LLC |
| ID | Technology | Fuel | Nameplate capacity | Status | Online |
|---|---|---|---|---|---|
| PAEEL | Solar Photovoltaic | Solar | 1.1 MW | Operating | 2012 |
| NERC Region | WECC |
|---|---|
| Balancing Authority | Arizona Public Service Company |
Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.
| Data center | Distance |
|---|---|
| Iron Mountain AZP-2 | 1.3 mi |
| Iron Mountain AZP-1 | 1.4 mi |
| J-Curve Technologies | 1.6 mi |
| PhoenixNAP | 1.9 mi |
| Alembic Computer Services, Inc. | 2.1 mi |
| QTS | 2.1 mi |
| 1GServers | 2.8 mi |
| EdgeConneX data center, Tempe | 2.8 mi |
Data centers mapped on OpenStreetMap within 25 miles. A data center draws from the regional grid, so being near this plant doesn't mean it buys this plant's power. U.S. data center map