Electric generating plantEIA plant no. 62643

AZ State University - Tempe Campus Solar

Type
Solar Photovoltaic
Nameplate capacity
2.5 MW
Units
12
In service since
2003–2025
Operator
Arizona State University FDM
Location
Tempe, Maricopa County, Arizona
Rated 183rd largest in Arizona · 10573rd of 14,761 in the U.S. · by nameplate

AZ State University - Tempe Campus Solar is a solar power plant in Arizona with a nameplate capacity of 2.5 MW. It generates roughly 2.6k MWh per year — enough to power about 250 average U.S. homes.

Its capacity factor of 13% reflects intermittent or peaking operation.

On paper vs. what it actually made

each square = 1 hour at full nameplate

Run flat out every hour of the year, AZ State University - Tempe Campus Solar could make 21.0k MWh. In 2023 it made 2.6k MWh — the same as running at full power 13 hours in every 100.

Nameplate, full year21.0k MWh2.4 MW × 8,760 hours
Actually generated2.6k MWhEPA eGRID, 2023 · ≈250 homes

Peaking or variableCapacity factor 13%. It runs only part of the time — when demand is high, or when the wind or sun allows.

How it works

A solar farm

DCAC1panels turn light into DC current2inverters make AC3to the grid
  1. Silicon cells in each panel turn sunlight directly into direct current (DC). Nothing moves; nothing burns.
  2. Inverters convert DC into the alternating current (AC) the grid uses.
  3. A substation raises the voltage and sends it onto transmission lines.

Why the numbers look like this: panels make nothing at night and less in winter, so even a well-placed U.S. solar farm averages around a quarter of its nameplate over a year. Watch the monthly bars: they swell in summer and shrink in December.

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

Natural GasHydroelectricSolarBattery Storage

Location

Address1551 S. Rural Road
CityTempe
CountyMaricopa County
StateArizona
ZIP85287
Coordinates33.42428, -111.92822
OperatorArizona State University FDM

Generators (12)

IDTechnologyFuelNameplate capacityStatusOnline
3384Solar PhotovoltaicSolar0.7 MWOperating2009
3385Solar PhotovoltaicSolar0.6 MWOperating2008
20794Solar PhotovoltaicSolar0.2 MWOperating2013
20971Solar PhotovoltaicSolar0.2 MWOperating2013
20799Solar PhotovoltaicSolar0.1 MWOut of Service2013
20974Solar PhotovoltaicSolar0.1 MWOperating2013
20975Solar PhotovoltaicSolar0.1 MWOperating2003
3365ASolar PhotovoltaicSolar0.1 MWOut of Service2009
3365BSolar PhotovoltaicSolar0.1 MWOut of Service2009
4202Solar PhotovoltaicSolar0.1 MWOperating2009
91001Solar PhotovoltaicSolar0.1 MWOperating2018
ISTB7Solar PhotovoltaicSolar0.1 MWOperating2025

Grid context

NERC RegionWECC
Balancing AuthorityArizona Public Service Company

About Solar plants

Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.

Other plants in Maricopa County

View all plants in Maricopa County →

Data centers near AZ State University - Tempe Campus Solar

Data centerOperatorDistance
Omnis NetworkNot recorded2.5 mi
J-Curve TechnologiesNot recorded2.6 mi
EdgeConneX data center, TempeEdgeConneX3.1 mi
Alembic Computer Services, Inc.Not recorded3.1 mi
Iron Mountain AZP-2Iron Mountain3.4 mi
Iron Mountain AZP-1Iron Mountain3.4 mi
Centersquare: Phoenix - (PHX1 - Mesa)Centersquare4.0 mi
1GServersNot recorded4.6 mi

Data centers mapped on OpenStreetMap within 25 miles. A data center draws from the regional grid, so being near this plant doesn't mean it buys this plant's power. U.S. data center map

Explore more