Electric generating plantEIA plant no. 60822

Intel - Ocotillo Campus Solar

Type
Solar Photovoltaic
Nameplate capacity
4.2 MW
Units
2
In service since
2017–2018
Operator
Tesla Inc.
Location
Chandler, Maricopa County, Arizona
Rated 171st largest in Arizona · 9026th of 14,761 in the U.S. · by nameplate

Intel - Ocotillo Campus Solar is a solar power plant in Arizona with a nameplate capacity of 4.2 MW. It generates roughly 10.7k MWh per year — enough to power about 1,015 average U.S. homes.

Its capacity factor of 29% reflects intermittent or peaking operation.

On paper vs. what it actually made

each square = 1 hour at full nameplate

Run flat out every hour of the year, Intel - Ocotillo Campus Solar could make 36.8k MWh. In 2023 it made 10.7k MWh — the same as running at full power 29 hours in every 100.

Nameplate, full year36.8k MWh4.2 MW × 8,760 hours
Actually generated10.7k MWhEPA eGRID, 2023 · ≈1,015 homes

Peaking or variableCapacity factor 29%. It runs only part of the time — when demand is high, or when the wind or sun allows.

How it works

A solar farm

DCAC1panels turn light into DC current2inverters make AC3to the grid
  1. Silicon cells in each panel turn sunlight directly into direct current (DC). Nothing moves; nothing burns.
  2. Inverters convert DC into the alternating current (AC) the grid uses.
  3. A substation raises the voltage and sends it onto transmission lines.

Why the numbers look like this: panels make nothing at night and less in winter, so even a well-placed U.S. solar farm averages around a quarter of its nameplate over a year. Watch the monthly bars: they swell in summer and shrink in December.

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

Natural GasHydroelectricSolarBattery Storage

Location

Address4500 S Dobson Rd
CityChandler
CountyMaricopa County
StateArizona
ZIP85248
Coordinates33.24326, -111.89235
OperatorTesla Inc.

Generators (2)

IDTechnologyFuelNameplate capacityStatusOnline
PV1Solar PhotovoltaicSolar2.8 MWOperating2017
PV2Solar PhotovoltaicSolar1.4 MWOperating2018

Grid context

NERC RegionWECC
Balancing AuthorityArizona Public Service Company

About Solar plants

Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.

Other plants in Maricopa County

View all plants in Maricopa County →

Data centers near Intel - Ocotillo Campus Solar

Data centerOperatorDistance
PHX8CyrusOne1.7 mi
PHX7CyrusOne1.7 mi
PHX6CyrusOne1.8 mi
PHX5CyrusOne1.9 mi
PHX4CyrusOne1.9 mi
PHX1CyrusOne2.0 mi
PHX3CyrusOne2.1 mi
Digital Realty Phoenix PHX15Digital Realty2.2 mi

Data centers mapped on OpenStreetMap within 25 miles. A data center draws from the regional grid, so being near this plant doesn't mean it buys this plant's power. U.S. data center map

Explore more