AUS3

AUS3 is a data center run by CyrusOne in Austin, Travis County, Texas. It is mapped as 1 building covering about 4.1 acres (180,000 sq ft). Its power comes off the Texas (ERCOT) grid (ERCOT), which runs on 50% natural gas, 23% wind and 13% coal.

OperatorCyrusOneas mapped
Roof area4.1 ac1 building
Grid CO₂733 lbper MWh, ERCT region
Nearest plant1.0 miSystem Control Center

Location

This data centerOther data centersPower plants (colored by fuel)

Address7100 Metropolis Drive, Austin TX 78744
CountyTravis County, Texas
Coordinates30.20698, -97.70101
Websitewww.cyrusone.com/data-centers/north-america/austin-texas
On OpenStreetMapway/455171103

What powers AUS3

A data center doesn't run on the nearest power plant. It draws from the regional grid, where electricity from every plant on the system mixes. This site is in EPA's Texas (ERCOT) grid region, and the county's largest utility is on the ERCOT grid. In 2023, the region's electricity was 50% natural gas, 23% wind, 13% coal and 9% nuclear.

Each megawatt-hour carried about 733 lb of CO₂, close to the U.S. grid as a whole (765 lb).

Natural Gas 50%Wind 23%Coal 13%Nuclear 9%Solar 6%

Share of electricity generated in EPA's Texas (ERCOT) grid region (ERCT) in 2023, from eGRID. 477 TWh from 749 plants.

Utilities that serve Travis County

UtilityTypeGridBusiness rateIndustrial rate
Austin EnergyMunicipalERCOT10.4¢6.8¢
Pedernales Electric Coop, IncCooperativeERCOT12.8¢6.4¢
Bluebonnet Electric Coop, IncCooperativeERCOT5.2¢10.2¢

Utilities that report serving Travis County to the EIA (Form 861, 2024), largest first. Rates are each utility's average revenue per kilowatt-hour from commercial and from industrial customers across the state in 2024; a large data center usually negotiates its own contract.

Nearest power plants

PlantFuelCapacityDistance
System Control CenterOther Fossil5.0 MW1.0 mi
ABIA Parking StructureSolar1.8 MW1.9 mi
Kingsberry Energy Storage SystemOther Fossil1.5 MW4.2 mi
PowerFin KingsberySolar2.6 MW4.2 mi
Austin TX GigaFactorySolar5.4 MW4.9 mi
Gftx BESSBattery Storage125 MW5.1 mi
Sand HillNatural Gas696 MW5.3 mi
Hal C Weaver Power PlantNatural Gas153 MW5.9 mi
Robert Mueller Energy CenterNatural Gas6.1 MW6.8 mi
AustinHydroelectric18.0 MW7.8 mi

The largest power plant within 50 miles is Rio Nogales Power Project, a 1,108 MW natural gas plant 45 miles away.

Operating plants from EIA Form 860, by straight-line distance. Being close doesn't mean a plant supplies the site.

Other data centers within 5 miles

Data centerOperatorRoof areaDistance
AUS2CyrusOne1.8 ac0.2 mi
Digital Realty Austin AUS11Digital Realty1.8 ac0.5 mi
LightEdge Austin IIOperator not recorded2.0 ac0.6 mi
Data Foundry Austin 1 Data CenterOperator not recorded1.2 ac0.7 mi
LightEdge Austin IOperator not recorded0.7 ac0.9 mi
Data Foundry - Texas 2Operator not recorded2.4 ac0.9 mi
Data Foundry - Texas 1Operator not recorded3.1 ac0.9 mi
Lumen Austin 1Operator not recorded1.7 ac1.0 mi
Alpheus DataCenterAlpheus0.8 ac3.9 mi
Lumen Austin 3Lumen Technologies0.1 ac4.0 mi
Cortex supercomputerOperator not recorded9.3 ac4.9 mi

More

Data centers in Texas · Data centers in Travis County · All CyrusOne data centers · U.S. data center map

About this data

The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.

The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.

How the power-plant data is built · Data centers near me