Electric generating plantEIA plant no. 67860

Gftx BESS

Type
Batteries
Nameplate capacity
125 MW
Units
1
In service since
2024
Operator
Giga Texas Energy LLC
Location
Austin, Travis County, Texas
Rated 498th largest in Texas · 2379th of 14,761 in the U.S. · by nameplate

Gftx BESS is a battery storage power plant in Texas with a nameplate capacity of 125 MW.

The 125 MW is nameplate capacity: the most this plant's generators are rated to produce, not what it actually generates. EPA eGRID reports no positive net generation for it this year.

How it works

A battery storage site

charge middaydischarge evening1battery containers2inverters, both ways3the grid
  1. Rows of shipping-container-sized battery racks store electricity chemically.
  2. Inverters charge them from the grid — often midday, when solar is plentiful and cheap.
  3. In the evening peak the same inverters run the other way and send power back.

Why the numbers look like this: every charge-and-discharge cycle loses some energy as heat, so a storage site usually reports slightly negative net generation: it takes in a little more than it gives back. Its job is timing, not making energy.

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

Natural GasHydroelectricSolarBiomassBattery Storage

Location

Address1 Tesla Road
CityAustin
CountyTravis County
StateTexas
ZIP78725
Coordinates30.22828, -97.61883
OperatorGiga Texas Energy LLC

Generators (1)

IDTechnologyFuelNameplate capacityStatusOnline
GFTXBatteriesBattery125 MWOperating2024

Grid context

NERC RegionTRE
Balancing AuthorityElectric Reliability Council of Texas, Inc.

About Battery Storage plants

Battery storage facilities don't generate electricity — they store it. They charge from the grid (often from solar during the day) and discharge during peak demand or to firm up renewables. EIA classifies them as power plants because they connect to the grid like one.

Other plants in Travis County

View all plants in Travis County →

Data centers near Gftx BESS

Data centerOperatorDistance
Cortex supercomputerNot recorded0.9 mi
Data Foundry Austin 1 Data CenterNot recorded4.7 mi
Digital Realty Austin AUS11Digital Realty4.7 mi
AUS2CyrusOne5.0 mi
AUS3CyrusOne5.1 mi
LightEdge Austin IINot recorded5.6 mi
LightEdge Austin INot recorded5.7 mi
Data Foundry - Texas 2Not recorded6.0 mi

Data centers mapped on OpenStreetMap within 25 miles. A data center draws from the regional grid, so being near this plant doesn't mean it buys this plant's power. U.S. data center map

Explore more