Austin TX GigaFactory is a solar power plant in Texas with a nameplate capacity of 5.4 MW.
The 5.4 MW is nameplate capacity: the most this plant's generators are rated to produce, not what it actually generates. EPA eGRID reports no positive net generation for it this year.
How it works
Why the numbers look like this: panels make nothing at night and less in winter, so even a well-placed U.S. solar farm averages around a quarter of its nameplate over a year. Watch the monthly bars: they swell in summer and shrink in December.
This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.
| Address | 13101 Harold Green Rd |
|---|---|
| City | Austin |
| County | Travis County |
| State | Texas |
| ZIP | 78725 |
| Coordinates | 30.22021, -97.61968 |
| Operator | Tesla Inc. |
| ID | Technology | Fuel | Nameplate capacity | Status | Online |
|---|---|---|---|---|---|
| C02 | Solar Photovoltaic | Solar | 1.9 MW | Operating | 2023 |
| B05 | Solar Photovoltaic | Solar | 1.2 MW | Operating | 2025 |
| C01 | Solar Photovoltaic | Solar | 1.2 MW | Operating | 2025 |
| B07 | Solar Photovoltaic | Solar | 1.1 MW | Operating | 2025 |
| NERC Region | TRE |
|---|---|
| Balancing Authority | Electric Reliability Council of Texas, Inc. |
Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.
| Data center | Distance |
|---|---|
| Cortex supercomputer | 0.3 mi |
| Data Foundry Austin 1 Data Center | 4.6 mi |
| Digital Realty Austin AUS11 | 4.6 mi |
| AUS2 | 4.8 mi |
| AUS3 | 4.9 mi |
| LightEdge Austin II | 5.4 mi |
| LightEdge Austin I | 5.6 mi |
| Lumen Austin 1 | 5.8 mi |
Data centers mapped on OpenStreetMap within 25 miles. A data center draws from the regional grid, so being near this plant doesn't mean it buys this plant's power. U.S. data center map