DUR1 is a data center run by CyrusOne in Durham, Durham County, North Carolina. It is mapped as 1 building covering about 6.2 acres (268,000 sq ft). Its power comes off the Virginia/Carolinas grid (Duke Energy Carolinas), which runs on 40% nuclear, 39% natural gas and 10% coal.
This data centerOther data centersPower plants (colored by fuel)
| Address | 2223 Northeast Creek Parkway, Durham NC 27713 |
|---|---|
| County | Durham County, North Carolina |
| Coordinates | 35.93530, -78.88069 |
| Website | www.cyrusone.com/data-centers/north-america/durham-nc-dur1-… |
| On OpenStreetMap | way/617525579 |
A data center doesn't run on the nearest power plant. It draws from the regional grid, where electricity from every plant on the system mixes. This site is in EPA's Virginia/Carolinas grid region, and the county's largest utility is on the Duke Energy Carolinas grid. In 2023, the region's electricity was 40% nuclear, 39% natural gas, 10% coal and 6% solar.
Each megawatt-hour carried about 590 lb of CO₂, 23% cleaner than the U.S. grid as a whole (765 lb).
Share of electricity generated in EPA's Virginia/Carolinas grid region (SRVC) in 2023, from eGRID. 321 TWh from 1,273 plants.
| Utility | Business rate | Industrial rate |
|---|---|---|
| Duke Energy Carolinas, LLC | 9.9¢ | 7.8¢ |
| Duke Energy Progress - (NC) | 11.3¢ | 7.9¢ |
| Wake Electric Membership Corp | 11.1¢ | 4.7¢ |
| Piedmont Electric Member Corp | 14.3¢ | 9.3¢ |
Utilities that report serving Durham County to the EIA (Form 861, 2024), largest first. Rates are each utility's average revenue per kilowatt-hour from commercial and from industrial customers across the state in 2024; a large data center usually negotiates its own contract.
| Plant | Fuel | Capacity | Distance |
|---|---|---|---|
| XPF Solar Field | Solar | 3.0 MW | 1.7 mi |
| Durham Solar | Solar | 3.5 MW | 5.1 mi |
| Mas Durham Power, LLC | Biomass | 2.2 MW | 6.7 mi |
| Univ of NC Chapel Hill Cogen Facility | Natural Gas | 32.0 MW | 10.3 mi |
| Star Solar | Solar | 5.0 MW | 10.5 mi |
| Farrington Farm | Solar | 1.0 MW | 10.7 mi |
| SAS Solar Farm | Solar | 2.0 MW | 11.1 mi |
| Vickers | Solar | 2.0 MW | 13.6 mi |
| Century Drive Solar Farm | Solar | 1.0 MW | 13.6 mi |
| NCSU Cates Cogeneration Plant | Natural Gas | 11.2 MW | 15.6 mi |
The largest power plant within 50 miles is Roxboro, a 2,558 MW coal plant 39 miles away.
Operating plants from EIA Form 860, by straight-line distance. Being close doesn't mean a plant supplies the site.
| Data center | Roof area | Distance |
|---|---|---|
| DUR2 | 1.9 ac | 0.1 mi |
| Windstream Communications | — | 4.1 mi |
| Level 3 Communications | — | 4.1 mi |
Data centers in North Carolina · Data centers in Durham County · All CyrusOne data centers · U.S. data center map
The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.
The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.